Closed tender

Architect Lead Design Team for the New Development of Leighton Hospital Campus

Details

Value
£4,000,000
Topic
Architectural design services
Published
17 January 2024
Submission
16 February 2024

Tender description

Mid Cheshire Hospitals NHS Foundation Trust (MCHFT) (the "Authority") is issuing this Invitation to Tender ("ITT") in connection with the competitive procurement of Architect Lead Design Team Services for the New Development of Leighton Hospital Campus. <br/><br/>This procurement will be run via a Restricted Procedure under the Public Contracts Regulations 2015 ("PCR").<br/><br/>MCHFT is in the initial stages of a new project to construct a new hospital, which will replace the existing Leighton Hospital which is affected by Reinforced Autoclaved Aerated Concreate (RAAC) throughout circa 80.00% of its buildings. The vision for the project is to design and build a new state of the art hospital that will play a vital role at the heart of the community, placing digital innovation at the forefront of health services designed to tackle inequalities and meet the needs of a growing and ageing population. The ambition is that this project will transform the quality of healthcare for the people of Cheshire and across the Northwest of England.<br/><br/>At the centre of the programme will be the “hospital 2.0” concept, a vision for how hospital schemes can be delivered with greater efficiency and reduced cost. An integrated systems approach will provide “optimised, standardised and repeatable solutions for scheme development, design, construction, and operation. <br/><br/>The purpose of this procurement exercise is to appoint an Architect Lead Design Team (including Mechanical, Electrical, Structural, Digital Architect) to provide services covering RIBA Stages 2 to 3.<br/><br/>The Authority is seeking interest from consultants who will provide the service of an Architect who will also act as the lead design coordinator of an Architect-Led Design Team (ALDT), including Wayfinding, Digital Architect, and the below services:<br/><br/>Core Architectural Services, Lead Design Coordinator and the below specialisms:<br/>• Medical Equipment<br/>• Daylight/Sunlight<br/>• Wind<br/>• Landscaping<br/>• Catering<br/>• Waste and Logistics<br/>• Lighting<br/>• Acoustics<br/>• Inclusive Design<br/>• Façade Access<br/>• Façade Engineering<br/><br/>Core Mechanical, Electrical and Plumbing (MEP) Engineering Services and the below specialisms:<br/>• BREEAM<br/>• Net Zero Carbon<br/>• IT and AV<br/>• Lifts<br/>• Security<br/>• Fire Engineering<br/><br/>Core Civil and Structural (C&S) Engineering Services and the below specialism:<br/>• Transport Planning<br/><br/>Please note that Principal Designer services are to be provided by others and not by the Architect Lead Design Team.<br/><br/>The Authority reserves the right to extend the contract for the Architect Lead Design Team beyond RIBA stage 3 without the need for a further procurement exercise but through way of novation. In exercising its discretion to extend, the Authority will consider the successful bidder’s performance up to the point it is considering any extension and weather any benefit to the overall programme to extending with the current supplier outweighs any potential benefit in carrying out a further procurement exercise.<br/><br/>The contract will include the NEC4 Professional Service Contract (PSR) set out in Annex A1. It is vital that the bidder review these carefully and take account of all information such as key performance indicators and insurance requirements and that the tender fully takes account of these. By submitting a tender, bidders are agreeing to be bound by the terms of this ITT and the NEC4 Professional Service Contract (PSR) without further negotiation or amendment. Lot 1: Mid Cheshire Hospitals NHS Foundation Trust (MCHFT) (the "Authority") is issuing this Invitation to Tender ("ITT") in connection with the competitive procurement of Architect Lead Design Team Services for the New Development of Leighton Hospital Campus. <br/><br/>This procurement will be run via a Restricted Procedure under the Public Contracts Regulations 2015 ("PCR").<br/><br/>MCHFT is in the initial stages of a new project to construct a new hospital, which will replace the existing Leighton Hospital which is affected by Reinforced Autoclaved Aerated Concreate (RAAC) throughout circa 80.00% of its buildings. The vision for the project is to design and build a new state of the art hospital that will play a vital role at the heart of the community, placing digital innovation at the forefront of health services designed to tackle inequalities and meet the needs of a growing and ageing population. The ambition is that this project will transform the quality of healthcare for the people of Cheshire and across the Northwest of England.<br/><br/>At the centre of the programme will be the “hospital 2.0” concept, a vision for how hospital schemes can be delivered with greater efficiency and reduced cost. An integrated systems approach will provide “optimised, standardised and repeatable solutions for scheme development, design, construction, and operation. <br/><br/>The purpose of this procurement exercise is to appoint an Architect Lead Design Team (including Mechanical, Electrical, Structural, Master-planning (This is site wide, rather than the master-planning associated with just the hospital buildings), BIM support, Sustainability (including BNG)) to provide services covering RIBA Stages 2 to 3. For the purposes of this tender, it should be assumed that the successful practice will not novate over to a contractor team but instead be invited to remain with the trust in an advisory capacity through the build phases.<br/><br/>The Authority is seeking interest from consultants who will provide the service of an Architect who will also act as the lead design coordinator of an Architect-Led Design Team (ALDT), including Wayfinding, Digital Architect, and the below services:<br/><br/>Core Architectural Services, Lead Design Coordinator and the below specialisms:<br/>• Digital Architect<br/>• Daylight/Sunlight<br/>• Wind<br/>• Landscaping<br/>• Catering<br/>• Waste and Logistics<br/>• Lighting<br/>• Acoustics<br/>• Inclusive Design<br/>• Façade Access<br/>• Façade Engineering<br/><br/>Core Mechanical, Electrical and Plumbing (MEP) Engineering Services and the below specialisms:<br/>• BREEAM<br/>• Digital infrastructure around Biodiversity net gain<br/>• Net Zero Carbon<br/>• IT and AV<br/>• Lifts<br/>• Security<br/>• Fire Engineering<br/><br/>Core Civil and Structural (C&S) Engineering Services and the below specialism:<br/>• Transport Planning<br/><br/>Please note that Principal Designer services are to be provided by others and not by the Architect Lead Design Team.<br/><br/>The Authority reserves the right to extend the contract for the Architect Lead Design Team beyond RIBA stage 3 without the need for a further procurement exercise but through way of novation. In exercising its discretion to extend, the Authority will consider the successful bidder’s performance up to the point it is considering any extension and weather any benefit to the overall programme to extending with the current supplier outweighs any potential benefit in carrying out a further procurement exercise.<br/><br/>The contract will include the NEC4 Professional Service Contract (PSR) set out in Annex A1. It is vital that the bidder review these carefully and take account of all information such as key performance indicators and insurance requirements and that the tender fully takes account of these. By submitting a tender, bidders are agreeing to be bound by the terms of this ITT and the NEC4 Professional Service Contract (PSR) without further negotiation or amendment.<br/><br/>The estimated construction cost is circa £341m (excl VAT). The new Leighton Hospital is expected to have an initial capital requirement of circa £740m, with a scope of work over a period of 6 years.

Timeline

  1. TenderThis notice (current page)
    Published
    17 Jan 2024
    Deadline
    16 Feb 2024

About the buyer

Mid Cheshire Hospitals NHS Foundation Trust runs Leighton Hospital and community services across Cheshire, and buys as an NHS trust with its own procurement department. Much of this procurement flows through framework agreements and the Crown Commercial Service. Clinical consumables and medical equipment are sourced through NHS Supply Chain. A separate contact handles procurement for the trust's Healthier Futures hospital redevelopment programme.

Over the past 5 years, most of Mid Cheshire Hospitals NHS Foundation Trust's contract awards have been in health and social work, architectural and engineering services and IT services.

AI insights

  • Who did the buyer use last time?
  • Will the buyer buy this again?
  • What was the buyer trying to fix?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Architect Lead Design Team for the New Development of Leighton Hospital Campus, ranked by notice volume.

View all topics

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.