Closed tender

EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Buildings - Power And Other Small Works System Package

Details

Value
£375,000
Topic
Electrical installation work
Published
24 June 2024
Submission
5 July 2024

Tender description

EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation. EKFB are looking for a competent contractor to provide the power and small works package for the portal building . This specification outlines the requirements for hardwired low-voltage small power systems, including socket outlets, distribution boards, transformers, and protective devices. It covers installations in various environments such as mechanical plant rooms, outdoor areas, and locations requiring safety reduced voltage power supplies.

Timeline

  1. TenderThis notice (current page)
    Published
    24 Jun 2024
    Deadline
    5 Jul 2024

About the buyer

HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain.

Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.

AI insights

  • Who did High Speed Two (HS2) Ltd use last time?
  • Will High Speed Two (HS2) Ltd buy this again?
  • What was High Speed Two (HS2) Ltd trying to fix?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Buildings - Power And Other Small Works System Package, ranked by notice volume.

View all topics

Related buyers

Buyers similar to High Speed Two (HS2) Ltd.

View all buyers
BuyersCountValue
  1. 2,941
    £782.7m
  2. 1,195
    £13.9bn
  3. 813
    £8.9bn
  4. 528
    £16.1bn
  5. 501
    £4.5bn
  6. 439
    £131.7m
  7. 422
    £2.0m
  8. 396
    £434.6m
  9. 326
    £346.3m
  10. 281
    £20.2bn

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.