EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Fire Gas Suppression System Package
Details
- Value
- £375,000
- Topic
- Electrical installation work
- Published
- 24 June 2024
- Submission
- 5 July 2024
- Source
- uk:contracts_finder
Tender description
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation. EKFB are looking for a competent contractor to provide the fire gas suppression system. Design, supply, installation, testing, commissioning, certification, and integrity testing of the fire suppression system. This work should be based on the design intent shown in the respective drawings and specifications and comply with HS2 standards. The specialist will be responsible for the complete system, including coordination with mechanical and electrical contractors regarding damper locations, operation, and power requirements.
Timeline
- Completed: Tender published24 June 2024Current notice
- Completed: Submission date5 July 2024
About the buyer
HS2 Ltd is a non-departmental public body sponsored by the Department for Transport, and buys as a central government agency building Britain's high-speed railway between London and Birmingham. Framework agreements cover major packages, such as the lifts and escalators for Phase One stations. Four tier-one joint-venture contractors, including EKFB and Align JV, deliver the main civils work. Those contractors procure their own tier-two subcontractors, who source further down the chain.
Over the past 5 years, most of HS2's contract awards have been in construction work, metals and mining products and transport equipment.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
204 similar open tenders
See more open tenders related to Electrical installation work.
Related topics
Topics related to EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Fire Gas Suppression System Package, ranked by notice volume.
- 14,352£1.1tn
- 55,561£5.5tn
- 19,391£1.1tn
- 4,289£99.8bn
- 3,881£73.6bn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 2,959£722.5m
- 1,209£14.3bn
- 810£8.9bn
- 583£4.2bn
- 548£16.2bn
- 434£130.5m
- 394£427.5m
- 356£1.7m
- 318£340.0m
- 282£10.2bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.