DfI TRAM T-1136 LAGAN PEDESTRIAN AND CYCLE BRIDGE

Details

Value
GBP 23,000,000
Topic
Construction work
Published
4 June 2024
Submission
24 July 2024

Tender description

The proposed bridge is to be a twin-pylon, three-span cable stayed steel bridge over the River Lagan. The steel superstructure is supported on piled reinforced concrete piers and abutments and will convey a 5m wide shared pedestrian and cycle path, with approach ramps provided beyond the bridge at each end to tie into the existing pedestrian and cycle infrastructure. The cumulative bridge span is approximately 143m, comprising a 76m central span between pylons and two 33.5m back-spans. The height of the two steel pylons is approximately 26.5m. This will be a Design and Build project and as such the successful tenderer will be required to undertake the detailed design, fabrication, construction, testing and commissioning processes for all permanent and temporary works associated with the Contract, including but not limited to the following: • Detailed design of all permanent and temporary works • Technical approval and certification of the permanent and temporary works designs • Completion of all required further investigation, surveys and testing • Obtaining of all required third-party acceptances and/or approvals • Obtaining of all required licences and consents • Discharge of planning conditions • Construction of all permanent and temporary works • Management of utilities, stakeholders and temporary traffic and pedestrian arrangements Given the design and build nature of the contract the successful Economic Operator will be required to manage both the design and construction processes. The works to be undertaken as part of the Contract shall be set out in greater detail at the tender stage of the Procurement. Lot 1: The proposed bridge is to be a twin-pylon, three-span cable stayed steel bridge over the River Lagan. The steel superstructure is supported on piled reinforced concrete piers and abutments and will convey a 5m wide shared pedestrian and cycle path, with approach ramps provided beyond the bridge at each end to tie into the existing pedestrian and cycle infrastructure. The cumulative bridge span is approximately 143m, comprising a 76m central span between pylons and two 33.5m back-spans. The height of the two steel pylons is approximately 26.5m. This will be a Design and Build project and as such the successful tenderer will be required to undertake the detailed design, fabrication, construction, testing and commissioning processes for all permanent and temporary works associated with the Contract, including but not limited to the following: • Detailed design of all permanent and temporary works • Technical approval and certification of the permanent and temporary works designs • Completion of all required further investigation, surveys and testing • Obtaining of all required third-party acceptances and/or approvals • Obtaining of all required licences and consents • Discharge of planning conditions • Construction of all permanent and temporary works • Management of utilities, stakeholders and temporary traffic and pedestrian arrangements Given the design and build nature of the contract the successful Economic Operator will be required to manage both the design and construction processes. The works to be undertaken as part of the Contract shall be set out in greater detail at the tender stage of the Procurement.

Timeline

  1. Completed: Tender published4 June 2024
    Current notice
  2. Completed: Submission date24 July 2024

About the buyer

Department for Infrastructure is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45000000 · Construction work
  • 45200000 · Works for complete or part construction and civil engineering work
  • 45220000 · Engineering works and construction works
  • 45240000 · Construction work for water projects
  • 71300000 · Engineering services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.