Shetland 2 HVDC Converter Technology
Details
- Source
- Find a Tender
- Topic
- Construction work
- Published
- 5 April 2024
Tender description
Call off contract for two 2GW High Voltage Direct Current (HVDC) Voltage Sourced Converter Stations associated with the Shetland 2 HVDC Link Lot 1: Call-off contract for two 2GW High Voltage Direct Current (HVDC) Voltage Sourced Converter Stations associated with the Shetland 2 Link Project. The Call-off will include HVDC system design and testing, Procurement and installation of HVDC equipment, Commissioning of HVDC system, Civil requirement specification and Design deliverables to allow civil interface design to be completed, and sequencing of works as required to align with civil Construction. The event excludes civil engineering and associated works.
Timeline
- Awarded contractThis notice (current page)
- Published
- 5 Apr 2024
- Award
- 1 Sep 2026
About the buyer
Scottish Hydro Electric Power Distribution plc, known as SSEN Distribution, runs the electricity network across the north of Scotland and buys as a utilities organisation. Large capital projects are awarded through framework agreements split by geographical zone. Those frameworks cover underground cable works, substations and overhead lines. Flexibility services are procured under the Utilities Contracts (Scotland) Regulations 2016.
Over the past 5 years, most of Scottish Hydro Electric Power Distribution plc's contract awards have been in construction work, architectural and engineering services and waste, cleaning and environmental services.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@scottish-hydro-electric-power-distribution-plc.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@scottish-hydro-electric-power-distribution-plc.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@scottish-hydro-electric-power-distribution-plc.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@scottish-hydro-electric-power-distribution-plc.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@scottish-hydro-electric-power-distribution-plc.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@scottish-hydro-electric-power-distribution-plc.gov |
Related topics
Topics related to Shetland 2 HVDC Converter Technology, ranked by notice volume.
- 54,098£5.3tn
Related buyers
Buyers similar to Scottish Hydro Electric Power Distribution plc.
- 5£362.0m
- 2£14.8m
- 133£3.1bn
- 106£148.4m
- 98£7.0bn
- 87£3.0bn
- 78£2.8bn
- 53£4.6bn
- 47£46.0bn
- 45£7.4bn
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.