CGJ7/162A Clifton Bridge

Details

Value
GBP 7,500,000
Topic
Steel
Published
2 April 2024
Submission
9 April 2024

Tender description

CGJ7/162A is a three-span continuous post-tensioned segmental twin cell concrete underbridge on the West Coast Mainline between Oxenholme and Penrith. The central span of the structure passes over 6 lanes of the M6 Motorway with a span of 57.9m. The two back spans, referred to as the Lancaster Span and Penrith Span, have span lengths of 30.5m. The structure carries two 25kV electrified lines, the Up Main with a linespeed of 95mph and Down Main with a linespeed of 100mph and 105mph EPS (note error in CRT with regards to existing linespeeds). The deck is supported by bankseat abutments, and two intermediate reinforced concrete piers situated either side of the M6 carriageways. The structure was constructed in 1967 after the deck was slid into position during a possession. The deck is simply supported at the abutments but is supported continuously over the two intermediate piers. The free movement end is located at the Penrith bankseat. The two piers are 8.1m high and both are founded on reinforced concrete spread footings. Investigations completed by Ramboll in 2019 (ref. 1620000224/CGJ7/162A/AR/001), concluded that the current deck has a load-carrying capacity of RA0 at 100mph but that if traffic could be controlled so that only one track is loaded at a time, the bridge cold sustain 15BSUs at 100mph. These conclusions are predominantly due to the unbonded post-tensioning system. The most recent available detailed exam completed in June 2022, identified several significant structural defects: > The bearings are heavily corroded but do not appear to be deteriorating. > Hairline fractures to the high mileage abutment. This is a possible sign that the bearings may have seized. > Numerous areas of spalled concrete and exposed secondary reinforcement throughout the superstructure and with similar developing to the soffit of central span over motorway. > Widespread cracking to post-tensioned box girder both internally and externally.

Timeline

  1. Completed: Tender published2 April 2024
    Current notice
  2. Completed: Submission date9 April 2024

About the buyer

BiP SOlutions is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 14622000 · Steel
  • 45221115 · Construction work for steel bridges
  • 45223210 · Structural steelworks
  • 45262400 · Structural steel erection work
  • 45262420 · Structural steel erection work for structures

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

6 similar open tenders

See more open tenders related to CGJ7/162A Clifton Bridge.

Explore all open tenders

Related topics

Topics related to CGJ7/162A Clifton Bridge, ranked by notice volume.

View all topics
TopicCountValue
  1. 4,088
    £269.5bn

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.