WP4990 CTA Rail Fire Compartmentation - STAGE 1
Details
- Value
- £750,000
- Topic
- Fire-prevention installation works
- Published
- 25 March 2024
- Submission
- 15 April 2024
- Source
- uk:contracts_finder
Tender description
The Fire Compartmentation and Compliance project (scope of this contract) covers the following: • Rectification of existing non-compliant Passive Fire Protection installations • Enable fire compartmentation to be installed to current compliant standards • Associated temporary works (including during construction phasing) The CTA Cofferdam & Station Options Report noted concern that the fire compartmentation within the cofferdam is in poor condition. It recorded that a large quantity (approximately 300 locations) of non-compliant or damaged PFP installations were identified by visual surveys. It noted remedial works need to be undertaken to rectify the non-compliant Passive Fire Protection installations, stating that the Client is looking for the minimum required changes to ensure regulatory compliance and safe operation and maintenance of the fire compartmentation. The scope of works covers Stage 1 (Design) of the Fire Compartmentation and Compliance works, which is split into phases. Stage 2 (Build) will be covered by a separate enquiry.
Timeline
- Completed: Tender published25 March 2024Current notice
- Completed: Submission date15 April 2024
About the buyer
Costain Limited buys subcontract packages for its Heathrow H7 renewals work, from its base in Maidenhead. Subcontractors go through Costain Supplier Onboarding and due diligence checks before any award. Bids are scored on a Value Scorecard that covers technical capability, health and safety, quality and price. Some airside packages ask bidders to hold a Heathrow Airside Operations Licence. Packages cover the Central Terminal Area tunnel, with design, survey and construction work all tendered separately.
Over the past 5 years, most of Costain Limited's contract awards have been in construction work and architectural and engineering services.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@costain-limited-h7-heathrow.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@costain-limited-h7-heathrow.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@costain-limited-h7-heathrow.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@costain-limited-h7-heathrow.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@costain-limited-h7-heathrow.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@costain-limited-h7-heathrow.gov |
43 similar open tenders
See more open tenders related to Fire-prevention installation works.
- Open tender
Fire Door Inspections and Maintenance
- Open tender
Fire Curtains
- Open tender
WUTH-ITT-C484988 Minor, Small & Medium Works
- Open tender
Fire Dampers at University Hospitals Dorset
- Open tender
Depot Fire Break & Void Detection Surveys
- Open tender
Maintenance Services 2026
Related topics
Topics related to WP4990 CTA Rail Fire Compartmentation - STAGE 1, ranked by notice volume.
- 55,561£5.5tn
- 7,250£482.1bn
- 2,466£219.5bn
Related buyers
Buyers similar to Costain Limited (H7-Heathrow).
- 2,959£722.5m
- 1,779£172.3bn
- 1,648£55.4bn
- 1,600£17.0bn
- 1,442£1.6bn
- 1,209£14.3bn
- 1,044£2.5bn
- 1,028£1.8bn
- 1,006£3.3bn
- 890£922.8m
Finding public sector work shouldn't be hard
Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.