Closed tender

Dismantling of former Predator-Proof Fence and Installation of a replacement Predator-Proof Fence at Termoncarragh Lake and Annagh Machair SPA, County Mayo

Details

Topic
Dismantling works
Published
24 October 2023
Submission
24 November 2023
Source
eu:ted

Tender description

The LIFE On Machair project aims to protect and restore machair systems inside the Natura 2000 network in Ireland (SAC’s/SPA’s), with a particular focus on machair habitat, breeding waders and pollinators. Machair is a coastal habitat characterised by a plain of lime-rich, wind-blown sand that is- unique to the north and west of Ireland and Scotland. LIFE on Machair Project is seeking tenderers for the dismantling of a former predator proof fence and installation of a replacement predator proof fences in Co. Mayo. The aim of this fence is to continue to protect populations of breeding waders, principally Lapwing, Redshank and Snipe, from mammalian predation during the breeding season. This tender should also be read in conjunction with the ‘Volume B -Tender and Schedule’, ’Volume C- Pricing schedule and ‘Volume D – Specification’. The approximate length of the fence is 2.8 kilometres. The exact meterage will only be determined once the posts are in place, as local ground conditions may dictate small variations in the perimeter route. The approximate area to be fenced is 30ha. It is anticipated that works will commence in November 2023 and take approximately six to eight weeks to complete, though it may be longer, depending on local ground conditions at the time and weather during that period. The works will be phased as • Dismantling former fence. • Installation of new fence. Note that the dismantling and installation may be phased in sections upon agreement with the LOM Project, BirdWatch Ireland and NPWS as part of avoiding and reducing disturbance on the site / adapting to weather conditions. Please note that an Accompanied Site Visit by LIFE On Machair’s Team member (planned dates for site visit: 6th – 10th November 2023) is a mandatory requirement. Lot 1: The LIFE On Machair project aims to protect and restore machair systems inside the Natura 2000 network in Ireland (SAC’s/SPA’s), with a particular focus on machair habitat, breeding waders and pollinators. Machair is a coastal habitat characterised by a plain of lime-rich, wind-blown sand that is- unique to the north and west of Ireland and Scotland. LIFE on Machair Project is seeking tenderers for the dismantling of a former predator proof fence and installation of a replacement predator proof fences in Co. Mayo. The aim of this fence is to continue to protect populations of breeding waders, principally Lapwing, Redshank and Snipe, from mammalian predation during the breeding season. This tender should also be read in conjunction with the ‘Volume B -Tender and Schedule’, ’Volume C- Pricing schedule and ‘Volume D – Specification’. The approximate length of the fence is 2.8 kilometres. The exact meterage will only be determined once the posts are in place, as local ground conditions may dictate small variations in the perimeter route. The approximate area to be fenced is 30ha. It is anticipated that works will commence in November 2023 and take approximately six to eight weeks to complete, though it may be longer, depending on local ground conditions at the time and weather during that period. The works will be phased as • Dismantling former fence. • Installation of new fence. Note that the dismantling and installation may be phased in sections upon agreement with the LOM Project, BirdWatch Ireland and NPWS as part of avoiding and reducing disturbance on the site / adapting to weather conditions. Please note that an Accompanied Site Visit by LIFE On Machair’s Team member (planned dates for site visit: 6th – 10th November 2023) is a mandatory requirement.

Timeline

  1. Completed: Tender published24 October 2023
    Current notice
  2. Completed: Submission date24 November 2023

About the buyer

The Department of Housing, Local Government and Heritage sets national policy on housing, planning and heritage, and buys through its own procurement team. Frameworks, live contracts and guidance come from the Office of Government Procurement. Procurement rules follow the National Public Procurement Policy Framework and EU directives. Awarded public contracts are published under the Freedom of Information Publication Scheme.

Over the past 5 years, most of the Department of Housing, Local Government and Heritage's contract awards have been in waste, cleaning and environmental services, architectural and engineering services and agricultural and horticultural services.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

56 similar open tenders

See more open tenders related to Dismantling works.

Explore all open tenders

Related topics

Topics related to Dismantling of former Predator-Proof Fence and Installation of a replacement Predator-Proof Fence at Termoncarragh Lake and Annagh Machair SPA, County Mayo, ranked by notice volume.

View all topics
TopicCountValue
  1. 11,649
    £1.0tn
  2. 28,038
    £1.7tn

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.