Expired contract

Link Centre Ice Rink and Radiant Low Emissivity Ceiling

Details

Supplier(s)
Ice Tech UK
Value
£373,700
Duration
2 months
Topic
Leisure equipment
Published
19 October 2023

Tender description

Swindon Borough Council (the Authority) own a number of Leisure buildings within the local area that are operated under a lease agreement by Greenwich Leisure Limited (GLL). On Sunday 17th September 2023 and into Monday 18th September 2023, the Link Leisure Centre in Swindon suffered significant damage as a result of an unforeseeable and extreme weather event through significant storm flooding.The consequence of the storm damage was a total loss of power to the Link Leisure Centre and also that access to the building, specifically the ice rink area, was prevented for a period of two weeks due to health and safety requirements from a utilities provider. As a result, the Authority and GLL, could not assess the extent of the damage to the ice-skating plant and equipment. As soon as safe access to the building was permitted and the full extent of the damage was known, the Authority and GLL acted with extreme urgency to identify suitable replacement equipment that would enable the Ice rink provision to reopen for 17th December 2023. After careful consideration, on the 17th of October 2023, the Authority made the decision to make a direct contract award to Ice Tech UK to supply and install a new highly energy efficient IceGrid system and Radiant Low Emissivity ceiling at the Link Centre for a contract period of approximately 9 weeks.The total value of the contract is £373,700. The use of the negotiated procedure without prior publication under Regulation 32 of the Public Contracts Regulation 2015 has been relied on. Lot 1: Swindon Borough Council (the Authority) own a number of Leisure buildings within the local area that are operated under a lease agreement by Greenwich Leisure Limited (GLL). On Sunday 17th September 2023 and into Monday 18th September 2023, the Link Leisure Centre in Swindon suffered significant damage as a result of an unforeseeable and extreme weather event through significant storm flooding.The consequence of the storm damage was a total loss of power to the Centre and also that access to the Link Leisure Centre building, specifically the ice rink area, was prevented for a period of two weeks due to health and safety requirements from a utilities provider. As a result, the Authority and GLL, could not assess the extent of the damage to the ice-skating plant and equipment. As soon as safe access to the building was permitted and the full extent of the damage was known, the Authority and GLL acted with extreme urgency to identify suitable replacement equipment that would enable the Ice rink provision to reopen for 17th December 2023. It is expected that any delay in making a contract award decision would significantly impact on the ongoing viability of this local leisure provision and therefore result in a substantial impact to the local economy and wider community health and well-being. After careful consideration, on the 17th of October 2023, the Authority made the decision to make a direct contract award to Ice Tech UK to supply and install a new highly energy efficient IceGrid system and Radiant Low Emissivity ceiling at the Link Centre for a contract period of approximately 9 weeks.The total value of the contract is £373,700. The use of the negotiated procedure without prior publication under Regulation 32 of the Public Contracts Regulation 2015 has been relied on due to reasons of extreme urgency brought about by events unforeseeable by the Authority, competition being absent for technical reasons and the proprietary nature of the solution.

Timeline

  1. Awarded contractThis notice (current page)
    Published
    19 Oct 2023
    Award
    17 Oct 2023
    End
    17 Dec 2023

About the buyer

Swindon Borough Council buys as a local authority, running procurement through its own Corporate Procurement Team. Social value criteria weigh how each contract benefits Swindon's local economy, environment and wider community.

Over the past 5 years, most of Swindon Borough Council's contract awards have been in construction work, IT services and architectural and engineering services.

AI insights

  • Will Swindon Borough Council buy this again?
  • Is Ice Tech UK their go-to supplier?
  • How much has Swindon Borough Council spent on this?
  • What did Swindon Borough Council look for last time?

Free, no account needed

Get to the next one first

This contract's been awarded. We'll find a buyer that plans to buy what you sell, before any tender is published.

Find my next tender early
Save in app

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Link Centre Ice Rink and Radiant Low Emissivity Ceiling, ranked by notice volume.

View all topics

Related buyers

Buyers similar to Swindon Borough Council.

View all buyers

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.