Tender description
Manufacture and supply Pre Cast Concrete units and edge beams as drawings, to also include a trial assembly. About the buyer's selection process: The tender will be assessed on both a cost and non-cost basis using the following scoring criteria; · Price [30%] · Programme [30%] · Methodology [15%] · Capability / Experience [25%] About the buyer: A leader in transportation, the Murphy Transport division has a proud history dating back to the 1960's. Classed as a multi-disciplinary specialist, working across rail, highways, aviation and ports to deliver sustainable solutions. From major infrastructure projects to responding to emergencies, our range of services help keep the UK and Ireland moving, all whilst applying our unique 'One Murphy' approach. Simply put, this approach means we provide the people, plant and expertise to combat any construction and logistical challenges on even the most difficult sites. Whether using our plant to manage logistics or utilising our engineers to overcome design challenges, we provide practical and innovative results, working around the individual needs of our clients. That's why we're able to construct multi-use sites adjacent to or over major Network Rail and LUL tunnels, apply better engineered solutions and efficiently manage logistics in the busiest areas of the country. These projects are uniquely challenging - and our 'One Murphy' approach mitigates risks, minimises delays and offers significant cost savings. Manufacturer and supply East Riser unit Manufacturer and supply West Riser unit Manufacturer and supply East Cill unit Manufacturer and supply West cill unit Manufacturer and supply East Parapet infill concrete unit Manufacturer and supply West Parapet infill concrete unit "Full scale assembly of all beams in precasting works. - Crane to be provided by PCC and all necessary lifting equipment and documentation. - PCC manufacturer to replicate all setting out positions for bearings as detailed on drawings (these will be issued at a later stage) at their premises prior to undertaking the trial erection. - all setting out to be undertaken by PCC manufacturer and checked by JMS Associate/Engineer." Transport of PCC units between location of manfacture, position of trial erection and site compound. Storage of PCC units at PCC manufacturer's premises until ready for delivery to site. Vesting agreement for units may be required. Reconnaissance / swept path analysis of transport route Standing charge for 1No trailer on site for 1 week. (to include weekend) PCC Manufacturer to provide a tractor unit during the core possession to aid the maneuverers of the units as of when required. Please allow for 12 hour shifts. Additional information: Manufacturer and supply East Riser unit Manufacturer and supply West Riser unit Manufacturer and supply East Cill unit Manufacturer and supply West cill unit Manufacturer and supply East Parapet infill concrete unit Manufacturer and supply West Parapet infill concrete unit "Full scale assembly of all beams in precasting works. - Crane to be provided by PCC and all necessary lifting equipment and documentation. - PCC manufacturer to replicate all setting out positions for bearings as detailed on drawings (these will be issued at a later stage) at their premises prior to undertaking the trial erection. - all setting out to be undertaken by PCC manufacturer and checked by JMS Associate/Engineer." Transport of PCC units between location of manfacture, position of trial erection and site compound. Storage of PCC units at PCC manufacturer's premises until ready for delivery to site. Vesting agreement for units may be required. Reconnaissance / swept path analysis of transport route Standing charge for 1No trailer on site for 1 week. (to include weekend) PCC Manufacturer to provide a tractor unit during the core possession to aid the maneuverers of the units as of when required. Please allow for 12 hour shifts.
Timeline
- Completed: Tender published4 February 2022Current notice
- Completed: Submission date11 February 2022
About the buyer
BiP SOlutions is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 44114000 · Concrete
- 45223500 · Reinforced-concrete structures
- 45262300 · Concrete work
- 45262310 · Reinforced-concrete work
- 45262311 · Concrete carcassing work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@bip-solutions.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@bip-solutions.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@bip-solutions.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@bip-solutions.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@bip-solutions.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@bip-solutions.gov |
9 similar open tenders
See more open tenders related to 1002-000054 - Thomson Street, Stockport.
- Open tender
DPS
- Open tender
Highways Materials DPS
- Open tender
Highways Materials DPS
- Open tender
Construction work
- Open tender
Building Trades Contractor DPS
Related topics
Topics related to 1002-000054 - Thomson Street, Stockport, ranked by notice volume.
- 5,158£335.6bn
Related buyers
Buyers similar to BiP SOlutions.
- 131£110.5m
- 45£26.8m
- 41£109.1m
- 35£1.8m
- 32£41.9m
- 31—
- 28£12.8m
- 28£3.3m
- 28£4.1m
- 25£10.2m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.