Network Rail Eastern Midland Main Line Electrification Partnership Framework

Details

Value
GBP 1,200,000,000
Topic
Construction work
Published
1 December 2022
Submission
1 December 2023

Tender description

Network Rail (NR) intends to select suppliers to the Midland Main Line Electrification (MMLE) Partnership Framework for an initial term of 5 years with the option to extend in yearly increments up to a further 5 years. The MMLE programme will extend electric operation on the MML through to Nottingham and Sheffield. To help realise early electrification benefits, Route Section 1 (between Market Harborough to Wigston South) has been delivered separately from the remaining route sections as a continuation of the existing programme. The scope of this procurement is for the next stage of the electrification between Wigston and Nottingham out to Sheffield. One key MMLE objective is 'delivery on spend per single track kilometre (£/STK) target'. The recently commissioned London to Corby electrification was delivered at a rate of £3.7m per STK with the application of SPEED principles. The next stage of electrification is committed to achieving a rate of £2.5m per STK through collective delivery of the MMLE objectives, using of the partnering arrangements. The Framework shall be split into the 4 work disciplines across the following delivery lots: Lot 1 - Power & Distribution; Lot 2 - Structures & Civils; Lot 3 - OLE & Integration; Lot 4 - Signalling & Telecoms. There will be 1 Partner plus up to 2 pre-qualified reserve suppliers appointed to Lots 1, 2, 3 & 4. Reserve suppliers have been included to achieve appropriate resilience in delivery and to ensure business contingency. It is intended that reserve suppliers are not awarded a framework in the first instance, but should a framework supplier become insolvent, fall below required performance levels or other such event, then a reserve supplier would be engaged. The detail of this process will be confirmed at the ITT stage of the procurement. Tenderers may bid for any number of lots, and be awarded on a maximum of 2 different lots. The Partnership Framework includes a performance-based incentive mechanism to achieve the target STK rate and other MMLE objectives, including health and safety, decarbonisation and social value. Partners will be incentivised both individually and collectively. There will be an opportunity to comment on the contractual documentation at the ITT stage of the procurement. NR will determine which, if any, changes should result in revisions to the Framework based on the objective merit of the proposed changes. The contractual documentation will not be subject to negotiation. Any negotiations will relate to the price element only. Participants will have an opportunity to update their tenders following negotiations. Please note, that the value ranges of each Lot and total estimated value included in this contract notice are indicative only. Despite the £1.2 billion figure included in section II.1.5, NR currently has internal governance approval for a framework value of £950 million (associated with the main elements of the MMLE works as currently envisaged). The higher value included in this contract notice is not an absolute cap but is indicative of the potential level to which the original budget could increase if additional works and services to that which is currently envisaged, are required. All values are estimates only, and the final values will depend on the precise works and services required to be delivered, the means of delivery, the way in which projects and project risks materialise, the actual rates of inflation up to completion of the programme, and other factors. As such, they are not guaranteed and do not act as a minimum or maximum work value for the programme nor a guarantee as to volume. Lot 1: Power & Distribution The project includes for wiring the existing route configuration and at the existing line speeds. The works described within this Lot are deemed to include all supporting activities required to deliver the works including but not limited to: • Site establishment • Delivery and storage of equipment (access, RRAPs where required) • Enabling works • De-vegetation • Surveys (intrusive or otherwise) • Road closures • Traffic management • Passenger Management • Managing specialist sub-contractors • Supporting integration of all works through to hand back • Working collaboratively with the client team, other interfacing contractors and projects, design consultants engaged by the client, rail industry partners and stakeholders. Additional information: The lot value is for guidance only and is based on the projected spend for the 10 year framework duration. Lot 2: Structures & Civils The works described within this Lot are deemed to include all supporting activities required to deliver the works including: • Site establishment • Delivery and storage of equipment (access, RRAPs where required) • Enabling works • De-vegetation • Surveys (intrusive or otherwise) • Road closures • Traffic management • Passenger management • Managing specialist sub-contractors • Supporting integration of all works through to hand back • Working collaboratively with the Client team, other interfacing Contractors and projects, design consultants engaged by the Client, rail industry partners and stakeholders. Additional information: The lot value is for guidance only and is based on the projected spend for the 10 year framework duration. Lot 3: Overhead Line Equipment (OLE) The works described within this Lot are deemed to include all supporting activities required to deliver the works including but not limited to: • Site establishment • Delivery and storage of equipment (access, RRAPs where required) • Enabling works • De-vegetation • Surveys (intrusive or otherwise) • Road closures • Traffic management • Passenger Management • Managing specialist sub-contractors • Supporting integration of all works through to hand back • Working collaboratively with the client team, other interfacing Contractors and projects, design consultants engaged by the client, rail industry partners and stakeholders. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts. Lot 4: Signalling & Telecoms The works described within this Lot are deemed to include all supporting activities required to deliver the works including but not limited to: • Site establishment • Delivery and storage of equipment (access, RRAPs where required) • Enabling works • De-vegetation • Surveys (intrusive or otherwise) • Road closures • Traffic management • Passenger Management • Managing specialist sub-contractors • Supporting integration of all works through to hand back • Working collaboratively with the client team, other interfacing Contractors and projects, design consultants engaged by the client, rail industry partners and stakeholders. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.

Timeline

  1. Completed: Tender published1 December 2022
    Current notice
  2. Completed: Submission date1 December 2023

About the buyer

Network Rail is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45000000 · Construction work
  • 45100000 · Site preparation work
  • 45200000 · Works for complete or part construction and civil engineering work
  • 45210000 · Building construction work
  • 45213320 · Construction work for buildings relating to railway transport
  • 45213321 · Railway station construction work
  • 45221112 · Railway bridge construction work
  • 45300000 · Building installation work
  • 71332000 · Geotechnical engineering services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

174 similar open tenders

See more open tenders related to Network Rail Eastern Midland Main Line Electrification Partnership Framework.

Explore all open tenders

Related buyers

Buyers similar to Network Rail.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.