Expired contract

DS3 System Services – Volume Uncapped – Gate 7

Details

Duration
2 years
Topic
Energy and related services
Published
24 October 2022

Tender description

Gate 7 covers all 12 services as outlined in this Qualification System Briefing Document. There is: - A separate DS3 System Services Agreement for services in Ireland, which is to be entered into with EirGrid; and - A separate DS3 System Services Agreement for services in Northern Ireland, which is to be entered into with SONI The services are split into a number of Lots for each of the TSOs as follows: - Lots 1IE – 12IE relate to the System Services required by EirGrid. - Lots 1NI – 12NI relate to the System Services required by SONI. It is intended that the start date of each of the Contracts awarded under Gate 7 is 1st October 2022. It is intended that the term of each Contract will last until 30th April 2024, as per the decision of the Regulatory Authority set out in SEM-21-021 System Services Future Arrangements - Decision Paper 1, but with an option for each TSO to extend the term of its Contract in respect of any or all of its applicable Lots in certain defined cases for one additional time period of up to eighteen (18) months, at the discretion of the Contracting Entity. This option might apply where, for instance, there is a delay in completing the procurement for any subsequent phases envisaged under the DS3 Programme. Lot 243591: POR L1IE - Primary Operating Reserve Primary Operating reserve or ‘POR’ has the meaning given to it in the grid code Lot 243592: SOR L2IE - Secondary Operating Reserve Secondary Operating reserve or ‘SOR’ has the meaning given to it in the grid code Lot 243658: TOR1 L3IE - Tertiary 1 Operating Reserve Tertiary 1 operating reserve or ‘TOR1’ has the meaning given to it in the grid code Lot 243659: TOR2 L4IE - Tertiary 2 Operating Reserve Tertiary 2 operating reserve or ‘TOR2’ has the meaning given to it in the grid code Lot 243660: RRD L5IE - Replacement Reserve (De-Synchronised) RR (De-synchronised)’ means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (ii) when connected to the power system in the case of a demand side unit Lot 243661: RRS L6IE - Replacement Reserve (Synchronised) RR (Synchronised)’ means Replacement Reserve provided by the Providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module Lot 243662: SSRP L7IE - Steady State Reactive Power Steady-state reactive power or ‘SSRP’ means reactive power capability (Leading) and reactive power capability (Lagging) Lot 243663: SIR L8IE - Synchronous Inertial Response Synchronous Inertial Response (SIR) is the kinetic energy (at a Frequency of 50 Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR factor (SIRF) Lot 243664: RM1 L9IE - Ramping Margin 1 Hour Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to the company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest availability in that three hour period Lot 243665: RM3 L10IE - Ramping Margin 3 Hour Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within three hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period Lot 243666: RM8 L11IE - Ramping Margin 8 Hour Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period Lot 243667: FFR L12IE - Fast Frequency Response Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event Lot 243668: POR L1NI - Primary Operating Reserve Primary Operating Reserve and Primary Operating reserve or ‘POR’ has the meaning given to it in the grid code. Lot 243669: SOR L2NI - Secondary Operating Reserve Secondary Operating reserve or ‘SOR’ has the meaning given to it in the grid code Lot 243670: TOR1 L3NI - Tertiary 1 Operating Reserve Tertiary 1 operating reserve or ‘TOR1’ has the meaning given to it in the grid code Lot 243671: TOR2 L4NI - Tertiary 2 Operating Reserve Tertiary 2 operating reserve or ‘TOR2’ has the meaning given to it in the grid code Lot 243672: RRD L5NI - Replacement Reserve (De-Synchronised) RR (De-synchronised)’ means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (ii) when connected to the power system in the case of a demand side unit Lot 243673: RRS L6NI - Replacement Reserve (Synchronised) RR (Synchronised)’ means Replacement Reserve provided by the Providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module Lot 243674: SSRP L7NI - Steady State Reactive Power Steady-state reactive power or ‘SSRP’ means reactive power capability (Leading) and reactive power capability (Lagging) Lot 243675: SIR L8NI - Synchronous Inertial Response Synchronous Inertial Response (SIR) is the kinetic energy (at a Frequency of 50 Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR factor (SIRF) Lot 243676: RM1 L9NI - Ramping Margin 1 Hour Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to the company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest availability in that three hour period Lot 243677: RM3 L10NI - Ramping Margin 3 Hour Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within three hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period Lot 243678: RM8 L11NI - Ramping Margin 8 Hour Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period Lot 243679: FFR L12NI - Fast Frequency Response Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event

Timeline

  1. Awarded contractThis notice (current page)
    Published
    24 Oct 2022
    Award
    24 Oct 2022
    End
    30 Apr 2024

About the buyer

EirGrid plc is Ireland's electricity transmission system operator and buys as a utilities organisation. Contracts below the threshold follow the EirGrid Group procurement policy. Questions about tenders can go to the EirGrid tenders team.

Over the past 5 years, most of EirGrid plc's contract awards have been in architectural and engineering services, IT services and business services.

AI insights

  • Will EirGrid plc buy this again?
  • Is the winner their go-to supplier?
  • How much has EirGrid plc spent on this?
  • What did EirGrid plc look for last time?

Free, no account needed

Get to the next one first

This contract's been awarded. We'll find a buyer that plans to buy what you sell, before any tender is published.

Find my next tender early
Save in app

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

22 similar open tenders

See more open tenders related to Energy and related services.

Explore all open tenders

Related buyers

Buyers similar to EirGrid plc.

View all buyers

Finding public sector work shouldn't be hard

Make your next tender search effortless with Stotles. Set up alerts, find decision maker contacts and never miss a good-fit opportunity again.