HHP Investment Works Framework 2023 - 2029
Details
- Value
- GBP 14,000,000
- Topic
- Electrical supplies and accessories
- Published
- 23 August 2022
- Submission
- 23 September 2022
- Source
- uk:find_a_tender
Tender description
Hebridean Housing Partnership (HHP) is seeking to establish a multi lot, multi supplier framework to deliver its Investment Works programme for 2023 – 2027. HHP intend to appoint up to a maximum five contractors per Lot of the framework. The framework geographical delivery locations are: Lewis, Harris, Uists and Barra. The framework covers the following types of work across 18 lots: - Windows & Doors - Heating - Bathrooms - Kitchens - Roofing & Roughcast - Electrical - Environmental - Occupational Therapy - Energy Efficiency Lot 1: Windows & Door Replacement - Lewis & Harris Covers the replacement of window, doors, roof windows and store doors etc. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Lot 2: Heating Replacement Works - Lewis & Harris Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 3: Bathroom Replacement Works - Lewis & Harris Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Lot 4: Kitchen Replacement - Lewis & Harris Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Lot 5: Roofing & Roughcast Works - Lewis & Harris Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt). Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced. Fencing covers for new low level timber palisade fencing. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 6: Electrical Works - Lewis & Harris Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 7: Environmental Works - Lewis & Harris Covers the installation of fencing, footpaths and drainage works to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 8: Occupational Therapy Works - Lewis & Harris Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 9: Window & Door Replacement - Uists & Barra Covers the replacement of window, doors, roof windows and store doors etc. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 10: Heating Replacement - Uists & Barra Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system. Scope includes: -Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 11: Bathroom Replacement - Uists & Barra Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 12: Kitchen Replacement - Uists & Barra Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Lot 13: Roofing & Roughcast Works - Uists & Barra Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt). Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced. Fencing covers for new low level timber palisade fencing. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 14: Electrical Works - Uists & Barra Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 15: Environmental Works - Uists and Barra Covers the installation of fencing, footpaths and drainage works to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 16: Occupational Therapy Works - Uists & Barra Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 17: Energy Efficiency Works - All Areas Covers the upgrading of insulation to walls and roofs and all associated work to properties. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 18: Bathroom, Kitchen & Heating Installation Works - All Areas Covers larger programmes of work in relation to installation of bathrooms, kitchens and heating replacements. Programmes will not necessarily cover all three elements and may be restricted to a single element as applicable. Lot 1: Windows & Door Replacement - Lewis & Harris Covers the replacement of window, doors, roof windows and store doors etc. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Lot 2: Heating Replacement Works - Lewis & Harris Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 3: Bathroom Replacement Works - Lewis & Harris Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Lot 4: Kitchen Replacement - Lewis & Harris Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Lot 5: Roofing & Roughcast Works - Lewis & Harris Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt). Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced. Fencing covers for new low level timber palisade fencing. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 6: Electrical Works - Lewis & Harris Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 7: Environmental Works - Lewis & Harris Covers the installation of fencing, footpaths and drainage works to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 8: Occupational Therapy Works - Lewis & Harris Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 9: Window & Door Replacement - Uists & Barra Covers the replacement of window, doors, roof windows and store doors etc. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 10: Heating Replacement - Uists & Barra Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system. Scope includes: -Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 11: Bathroom Replacement - Uists & Barra Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 12: Kitchen Replacement - Uists & Barra Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. Lot 13: Roofing & Roughcast Works - Uists & Barra Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt). Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced. Fencing covers for new low level timber palisade fencing. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 14: Electrical Works - Uists & Barra Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 15: Environmental Works - Uists and Barra Covers the installation of fencing, footpaths and drainage works to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 16: Occupational Therapy Works - Uists & Barra Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 17: Energy Efficiency Works - All Areas Covers the upgrading of insulation to walls and roofs and all associated work to properties. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period Lot 18: Bathroom, Kitchen & Heating Installation Works - All Areas Covers larger programmes of work in relation to installation of bathrooms, kitchens and heating replacements. Programmes will not necessarily cover all three elements and may be restricted to a single element as applicable.
Timeline
- Completed: Tender published23 August 2022Current notice
- Completed: Submission date23 September 2022
About the buyer
Hebridean Housing Partnership Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 31680000 · Electrical supplies and accessories
- 31681000 · Electrical accessories
- 31681400 · Electrical components
- 31681410 · Electrical materials
- 34928200 · Fences
- 34928220 · Fencing components
- 34953000 · Access ramps
- 39141000 · Kitchen furniture and equipment
- 39141400 · Fitted kitchens
- 39715200 · Heating equipment
- 39715210 · Central-heating equipment
- 42131110 · Central-heating radiator valves
- 44112400 · Roof
- 44112410 · Roof frames
- 44112420 · Roof supports
- 44112500 · Roofing materials
- 44115200 · Plumbing and heating materials
- 44115210 · Plumbing materials
- 44115220 · Heating materials
- 44115600 · Stairlifts
- 44221000 · Windows, doors and related items
- 44221100 · Windows
- 44221110 · Window frames
- 44221200 · Doors
- 44221211 · Door frames
- 44221213 · Door thresholds
- 44221220 · Fire doors
- 44411200 · Baths
- 44411400 · Shower basins
- 44620000 · Central-heating radiators and boilers and parts
- 44621110 · Central-heating radiators
- 44621220 · Central-heating boilers
- 45111240 · Ground-drainage work
- 45210000 · Building construction work
- 45211300 · Houses construction work
- 45211310 · Bathrooms construction work
- 45232141 · Heating works
- 45233161 · Footpath construction work
- 45233253 · Surface work for footpaths
- 45233340 · Foundation work for footpaths
- 45260000 · Roof works and other special trade construction works
- 45261200 · Roof-covering and roof-painting work
- 45261210 · Roof-covering work
- 45261211 · Roof-tiling work
- 45261212 · Roof-slating work
- 45261410 · Roof insulation work
- 45261420 · Waterproofing work
- 45262522 · Masonry work
- 45310000 · Electrical installation work
- 45311000 · Electrical wiring and fitting work
- 45311100 · Electrical wiring work
- 45311200 · Electrical fitting work
- 45315000 · Electrical installation work of heating and other electrical building-equipment
- 45317000 · Other electrical installation work
- 45320000 · Insulation work
- 45321000 · Thermal insulation work
- 45330000 · Plumbing and sanitary works
- 45331000 · Heating, ventilation and air-conditioning installation work
- 45331100 · Central-heating installation work
- 45332200 · Water plumbing work
- 45342000 · Erection of fencing
- 45421100 · Installation of doors and windows and related components
- 45421110 · Installation of door and window frames
- 45421111 · Installation of door frames
- 45421112 · Installation of window frames
- 45421130 · Installation of doors and windows
- 45421131 · Installation of doors
- 45421132 · Installation of windows
- 45421151 · Installation of fitted kitchens
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@hebridean-housing-partnership-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@hebridean-housing-partnership-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@hebridean-housing-partnership-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@hebridean-housing-partnership-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@hebridean-housing-partnership-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@hebridean-housing-partnership-ltd.gov |
153 similar open tenders
See more open tenders related to HHP Investment Works Framework 2023 - 2029.
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
Provision of Contractor Services
- Open tender
Electrical Maintenance Framework (2025)
Related buyers
Buyers similar to Hebridean Housing Partnership Ltd.
- 45£23.0m
- 23£301.9m
- 20£5.8m
- 19£11.1m
- 18£15.4m
- 17£9.1m
- 16£6.7m
- 15£87.6m
- 14£5.9m
- 12£12.5m