Expired contract

Demolition Works

Details

Value
501,000
Topic
Works for complete or part construction and civil engineering work
Published
5 August 2022

Tender description

o Site clearance to Areas A, B & C for the installation of working platforms, haul roads and site welfare including management and disposal of all waste generated from site. o Surface vegetation clearance (de-veg) to enable access to permanent and temporary works locations. o Removal of minor underground obstructions and foundations as required. o Installation of ducting, pipework and drainage to and from the welfare facilities for the provision of power / services and removal of waste and foul water. o Installation of small concrete bases for site survey control set up works. o Excavation/trimming of existing ground for installation of working platforms in areas A-C as per attached presentation slides. o Installation of Pile mat/crane platform to Areas A, B & C. The subcontractor is to assume 400mm of 6F2 with 2 layers of geogrid. o Installation of haul/access roads from the main compound down to the satellite site access following the alignment of the reception line. Existing ballast is to be removed and replaced with a designed haul road. The subcontractor is to assume 300mm of 6F2 with 2 layers of geogrid. o Installation of compound hardstand area including foundations for welfare cabins and concrete footpaths. Subcontractor is to assume 2No. units double stacked (2x1x2) Suppliers will be required to have Constructionline Gold verification. If shortlisted, suppliers will be required to complete our internal PQQ form. The bids will be scored with a balanced scorecard approach that includes scoring on experience, resource, sustainability, health & safety, quality, and social value amongst other elements. VolkerFitzpatrick (VF) is the engineering and construction branch of the VolkerWessels Group, one of the leading engineering and construction companies in the UK. VolkerFitzpatrick have undertaken numerous major infrastructure projects across the UK such as HS2, Wembley Olympic Way, Stansted Airport, Brent Cross West Station and RAF bases Lossiemouth and Lakenheath. This overall project is working for BBVS JV at the Old Oak Common Station site. VF are undertaking the bridge demolition and replacement for the bridges over Old Oak Common Lane and the Central Line. VF will also be doing the temporary and permanent road lowering at Old Oak Common Lane. The overall programme is 2022-2028, to be done in 3 stages.

Timeline

  1. Completed: Contract expiry date31 July 2022
  2. Completed: Award published5 August 2022
    Current notice
  3. Completed: Award date5 August 2022

About the buyer

BiP SOlutions is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45200000 · Works for complete or part construction and civil engineering work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

35 similar open tenders

See more open tenders related to Demolition Works.

Explore all open tenders

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.