Prior Information Notice - HIF Rail Works Packages
Details
- Buyer
- Medway Council
- Value
- GBP 48,000,000
- Topic
- Construction work
- Published
- 8 March 2022
- Source
- uk:find_a_tender
Tender description
BRIEF DESCRIPTION OF THE PROJECT The works are located on the Hoo Peninsular. The Hoo peninsula is situated in Kent to the east of Gravesend and to the north of Chatham. As part of a Housing Infrastructure Funding Grant, Medway Council are upgrading the current freight only railway. The existing Network Rail line through the Hoo Peninsula is called the Grain Branch line which connects the North Kent Line at Hoo Junction to the Isle of Grain. The line was closed to passenger services in 1968 and is now a freight only railway, with no stations remaining. The 19km long line is a single, bi-directional line serving freight trains that use the Isle of Grain docks (Thamesport) and Cliffe sidings. The existing line will require enhancements to enable the required passenger services to operate while maintaining freight services. The new rail service will enable passengers to travel from a new station near Sharnal Street to the main line and on to London via connecting services to London Charing Cross, London Victoria, London Bridge, and London St Pancras International. 1/ Rail Enabling Works Procurement - June 2022 Start on Site – October 2022 Duration – 12/16 Weeks Approx. Value £700,000 Scope – 1A Site and vegetation clearance along the rail corridor, around rail loop location and at proposed Sharnal Street location. (Approval to Work on Network Rail required) 1B Utility Diversions. (Approval to Work on Network Rail maybe required) 1C Environmental Protection and Mitigations. (Approval to Work on Network Rail maybe required) 2/ Rail Advanced Works (Approval to Work on Network Rail required) Procurement – January 2023 Start on Site – July 2023 Duration – 26/30 Weeks Approx. Value £6,500,000 Scope – 2A Embankment Widening to facilitate the addition of a Rail Loop, Installation/Repair of Track Drainage, Bridge Deck Replacement. 2B Signalling Cliffe to Grainport. Signalling Panel Update. 2C Track Remedial Works. 2D Installation of DNO Power Supply, FSP/PSP Signalling Power Supply, Installation of Charging Facilities at Sharnal Street Station. 3/ Rail Main Works Procurement – January 2024 Start on Site – July 2024 Duration – 64 Weeks Approx. Value - £41,000,000 Scope – 3A Level Crossing Works, Main Line Signalling, Main Line Crossover, Installation of Track Loop, Signal Installation Hoo Junction to Sharnal Street Station. (Approval to Work on Network Rail required) 3B Construction of Sharnal Street Station to include, Station Building , Platform, Carpark, Access Road, together with associated drainage and earthworks and Hard and Soft Landscaping (Approval to Work on Network Rail may be required) Lot 1: BRIEF DESCRIPTION OF THE PROJECT The works are located on the Hoo Peninsular. The Hoo peninsula is situated in Kent to the east of Gravesend and to the north of Chatham. As part of a Housing Infrastructure Funding Grant, Medway Council are upgrading the current freight only railway. The existing Network Rail line through the Hoo Peninsula is called the Grain Branch line which connects the North Kent Line at Hoo Junction to the Isle of Grain. The line was closed to passenger services in 1968 and is now a freight only railway, with no stations remaining. The 19km long line is a single, bi-directional line serving freight trains that use the Isle of Grain docks (Thamesport) and Cliffe sidings. The existing line will require enhancements to enable the required passenger services to operate while maintaining freight services. The new rail service will enable passengers to travel from a new station near Sharnal Street to the main line and on to London via connecting services to London Charing Cross, London Victoria, London Bridge, and London St Pancras International. 1/ Rail Enabling Works Procurement - June 2022 Start on Site – October 2022 Duration – 12/16 Weeks Approx. Value £700,000 Scope – 1A Site and vegetation clearance along the rail corridor, around rail loop location and at proposed Sharnal Street location. (Approval to Work on Network Rail required) 1B Utility Diversions. (Approval to Work on Network Rail maybe required) 1C Environmental Protection and Mitigations. (Approval to Work on Network Rail maybe required) 2/ Rail Advanced Works (Approval to Work on Network Rail required) Procurement – January 2023 Start on Site – July 2023 Duration – 26/30 Weeks Approx. Value £6,500,000 Scope – 2A Embankment Widening to facilitate the addition of a Rail Loop, Installation/Repair of Track Drainage, Bridge Deck Replacement. 2B Signalling Cliffe to Grainport. Signalling Panel Update. 2C Track Remedial Works. 2D Installation of DNO Power Supply, FSP/PSP Signalling Power Supply, Installation of Charging Facilities at Sharnal Street Station. 3/ Rail Main Works Procurement – January 2024 Start on Site – July 2024 Duration – 64 Weeks Approx. Value - £41,000,000 Scope – 3A Level Crossing Works, Main Line Signalling, Main Line Crossover, Installation of Track Loop, Signal Installation Hoo Junction to Sharnal Street Station. (Approval to Work on Network Rail required) 3B Construction of Sharnal Street Station to include, Station Building , Platform, Carpark, Access Road, together with associated drainage and earthworks and Hard and Soft Landscaping (Approval to Work on Network Rail may be required)
Timeline
- Completed: Pre-tender published8 March 2022Current notice
About the buyer
Medway Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@medway-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@medway-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@medway-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@medway-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@medway-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@medway-council.gov |
122 similar open tenders
See more open tenders related to Prior Information Notice - HIF Rail Works Packages.
- Open tender
Property QUDM
- Open tender
Fair Park Regeneration
- Open tender
Southern Construction Framework (SCF-6)
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
UK DTE Projects (various upcoming)
Related topics
Topics related to Prior Information Notice - HIF Rail Works Packages, ranked by notice volume.
- 173,470£11.6tn
Related buyers
Buyers similar to Medway Council.
- 1,104£1.0bn
- 963£695.6m
- 883£1.7bn
- 850£14.1bn
- 766£154.9m
- 736£1.1bn
- 680£1.4bn
- 581£22.6bn
- 555£2.9bn
- 540£268.4m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
