Closed tender

Heat pumps

Details

Topic
Heat pumps
Published
14 February 2020
Submission
16 March 2020

Tender description

South Tyneside Council wishes to establish a district energy network in Jarrow. The construction of the district energy network and associated infrastructure is subject to a separate contract, currently in the procurement phase. In order for the Council to try to achieve RHI compliance within the available timescale, it wishes to procure a specialist heat pump supplier to manufacture, supply, install and commission a pump in accordance with the specification. It is intended that the contract with the successful heat pump supplier is novated to the main contractor once the main contractor is appointed — this is expected to occur in around September 2020. South Tyneside Council is looking to construct a district energy scheme to provide heat and power for South Tyneside Council operated buildings in central Jarrow. The new build energy centre and associated district heating and power network will provide low-cost, low-carbon energy direct to connected buildings via a dedicated network of pipelines and power cables. The proposed network will be known as the Viking Energy Network Jarrow (VENJ). The new Energy Centre serving the network will be built on an existing council owned brownfield site at Jarrow Staithes on the south bank of the River Tyne on the outskirts of Jarrow. The energy centre serving the proposed energy network project will extract water locally from the River Tyne and use water source heat pump (WSHP) technology to feed a district energy network. The WSHP will be supplemented by a gas fired combined heat and power unit (CHP). The electricity generated locally by the CHP will be fed by a private wire network (PWN) to the council operated buildings. A locally installed photovoltaic (PV) farm will also contribute to the electricity supply. Surplus electricity generated by the CHP and the PV will be stored in a battery energy storage system (BESS) for later release to the PWN. The proposed operational strategy utilising the electrical generation and BESS will mean that the WSHP will run on a carbon neutral basis for much of the summer periods for domestic hot water generation for the connected network buildings. The VENJ energy centre will generate and supply electricity directly over dedicated high voltage (HV) cabling to local substations, with a local low voltage (LV) final connection into the selected council buildings. Heat will be delivered directly to buildings via an underground pipe network of pre-insulated flow and return pipework. Performance specification for water source heat pump (WSHP). Initially the energy centre will be designed to serve 14 number buildings, 2 of which will be future connections only. The pipework network is being designed with expansion allowance and future proofing in mind. The PWN will have a connection to the local HV network from the current distribution network operator (DNO) which will assist in the event of any abnormal short-term peak loads being greater than that available through local generation and storage. Future phases could also see heat and power supplied to many other homes, offices, shops and hotels across the town centre, with future developments in Jarrow. The overall scheme has been driven by the council’s desire to reduce Jarrow’s carbon footprint, to reduce energy costs for council and to deliver affordable heat and power to its residents. The purpose of this specification is the outline the requirements of the water source heat pump package only which is to be tendered as a standalone contract. Scope of works The scope of works shall comprise the following elements: — selection, design, installation and commissioning of a water source heat pump which shall be located in the proposed energy centre of the building. The energy centre building construction and the wider installation and remainder of plant and equipment shall be part of a separate contract by the main contractor, — provision of new power supply to power water source (supply termination to WSHP equipment only), — all pipework terminations to and from heat pump, — mechanical ventilation installations to enable heat pump to operate, — BMS automatic controls and wiring (heat pump only), — builders work associated with heat pump, — heat pump footings and supports on structural slab, — energy meeting to comply with RHI requirement, — thermal insulation, — interface works, — acoustic works, — commissioning including seasonal commissioning. The WSHP specialist shall also allow further recommissioning visits post March 2021 once the rest of the district heating network comes online.

Timeline

  1. Completed: Tender published14 February 2020
    Current notice
  2. Completed: Submission date16 March 2020

About the buyer

South Tyneside Metropolitan Borough Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 42511110 · Heat pumps

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

15 similar open tenders

See more open tenders related to Heat pumps.

Explore all open tenders

Related topics

Topics related to Heat pumps, ranked by notice volume.

View all topics
TopicCountValue
  1. 322
    £92.5bn
  2. 5,153
    £932.4bn
  3. 2,992
    £331.6bn
  4. 11,175
    £1.0tn
  5. 26,970
    £1.7tn
  6. 22,980
    £1.8tn

Related buyers

Buyers similar to South Tyneside Metropolitan Borough Council.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.