Awarded contract

Trecenydd Footbridge Refurbishment

Details

Topic
Engineering works and construction works
Published
13 August 2020

Tender description

The work involved potential structural steel repairs, preparation to SA2 standard of cleanliness to bright steel and application of a three/two coat paint system over the entire footbridge and associated access steel ramps Remediation works will comprise either of the following Options individually or a combination of the two; Option 1: Footbridge remediation works as per the scope of works to be undertaken wholly in-situ of the bridge’s existing geographical location. Option 2: Footbridge remediation works to be undertaken in two part’s, simultaneously: Option 2: Part 1: Footbridge span, i.e structure spanning over traffic lanes, to be wholly removed and transported off site to a convenient location were the remediation works can be undertaken as per the scope of works. A site has been identified approximilty 1.5 miles east if the site, traveling eastward on the A469, see drawing SO901-006 for site location. Option 2: Part 2: Footbridge access ramps and steps to remain in-situ and remediation works undertaken within existing geographical location as per the scope of works. Working at height and management of traffic will be a specific hazard. Suitable temporary works such as design scaffolds (structural otherwise) will be required. Suitable planning and precaution required ensuring health and safety especially working at height and protection from hazardous processes of all who may be affected. If Option 2 is employed, suitably designed temporary structurers will be required to support cantilevering access ramps .The structural scaffolding will be designed to support the existing remaining structures and must be installed prior to lifting the main span. The contractor is to ensure any foundations and / or footing’s supporting the temporary works is suitable and satisfies the allowable ground bearing capacity. The loosening, lifting and transportation of the main span off site and subsequently returned and reconnecting must be undertaken and managed by a suitably qualified company and personal. A lifting plan must be developed and submitted for review / comment from the Client / Principal designer. All scaffolding, structural or otherwise, must be designed by a suitably competent designer who’s name and company must be supplied as part of the CPP. Additionally, calculations, design mythology and drawings ( if appropriate ) must be supplied to the Authority’s Principal Designer for review / comment prior to work commencement .CCBC will provide bridge loading / weight to inform any propping, transportation requirements. The appointed contractor or principal contractor are responsible for all temporary works design including water management and access. The contract is NEC3 Contract. This notice is to inform the market of a contract award

Timeline

  1. Completed: Award date11 June 2020
  2. Completed: Award published13 August 2020
    Current notice

About the buyer

Caerphilly County Borough Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45220000 · Engineering works and construction works
  • 45442121 · Painting work of structures

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

19 similar open tenders

See more open tenders related to Trecenydd Footbridge Refurbishment.

Explore all open tenders

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.