Tender description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Section 4: Scope of Works As part of the works for the Thames Tideway West project at Hammersmith Pumping Station (HAMPS), BMB are required to construct a Connection Culvert that will take the storm flows from the existing Thames Water Infrastructure into the new Tideway Tunnels and a Deaeration Gallery providing ventilation throughout the system. The pumping station is sited to the north of the River Thames, just west of the Hammersmith Bridge. These works are to run concurrently with other BMB areas of work including CSO Drop Shaft and Inlet Channel works. Full welfare facilities will be provided to all sub-contractors. This is for the construction of the permanent RC structures detailed below and include: • Connection Culvert • Flow Measurement Chamber (sited on top of the south end of the Connection Culvert) • Deaeration Gallery All method statements and ITP's will be complied by BMB with input from the FRC Subcontractor on all areas of the construction process. All materials that will be used in the permanent works will be supplied by BMB along with the associated Materials Compliance Record (MCRs) again with full input from the FRC Subcontractor. BMB will supply the concrete and reinforcement for all permanent works including blinding. The successful bidder will provide all means of concrete placement and labour to carry out the works safely, efficiently and to a high-quality standard. All temporary materials required and used for the construction of these phases of work will be supplied by the FRC Subcontractor. All temporary works are to be designed, supplied, erected and maintained by the FRC Subcontractor along with the associated CAT 3 check for each temporary works design. The tower crane will provide all lifting requirements; however, it is not allocated to the culvert & deaeration 100%. It services all other areas of site. Forward planning of the tower crane duties is discussed through the Site and Coordination Meetings to reduce delays where possible. NOTE: no delay claims will be accepted for lack of tower crane time or due to the tower crane being winded off. Other lifting options will be looked at to mitigate delays in a case by case basis. Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams. Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point. Provision of accurate product specifications to accompany the quotation. Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest. Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail. BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Hammersmith Site

Timeline

  1. Completed: Tender published27 March 2020
    Current notice
  2. Completed: Submission date7 May 2020

About the buyer

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 44114000 · Concrete
  • 44221400 · Shutters
  • 45421142 · Installation of shutters

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

8 similar open tenders

See more open tenders related to Thames Tideway Tunnel - C405 Main Works West - Hammersmith Deaeration Gallery & Connection Culvert.

Explore all open tenders

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.