Stale Pre-tender

Construction work for multi-dwelling buildings and individual houses

Details

Value
GBP 1,000,000,000
Topic
District heating
Published
1 October 2019

Tender description

The London Housing Consortium (LHC) (acting as the central purchasing body for the Welsh Procurement Alliance (WPA)), are consulting on the potential establishment of a framework agreement for residential construction (including any associated community buildings and facilities) across North and Mid-Wales. Please note that market consultation documents will be available from 12.00 noon on the date of publication of this PIN in the OJEU via the online edition TED (and if the date of publication is not a working day, on the next working day) via Procontract: https://procontract.due-north.com/Login Please see Section VI.3) for further details. Residential Construction in Ynys Môn (Anglesey). The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot — covering Lots 1-9 (the super-lot)' is being proposed plus additional specialist lots (see below). The works (including associated services and/or supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments, etc.) and ‘accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation, etc.). WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (super-lot)), for delivery of developments of varying sizes: up to 5 units, 5-15 units, 16-49 units, 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘super-lot’ for accommodation may also be appropriate on this basis. The framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places, health and care centres, recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘super-lot’. Residential Construction in Gwynedd The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’. Residential Construction in Conwy The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’. Residential Construction in Denbighshire The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’. Residential Construction in Flintshire The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’. Residential Construction in Wrexham The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’. Residential Construction in Ceredigion The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’. Residential Construction in South Powys The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’. Residential construction covering all counties (Super-lot) (covering all areas Lots 1 - 9) The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’. Residential Construction in North Powys The proposed lot structure consists of 9 lots across 8 North and Mid-Wales counties: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus an additional 'All counties lot - covering lots 1 - 9 (the Super-lot)' is being proposed plus additional specialist lots (see below). The Works (including associated Services and / or Supplies) to be delivered include the development of new build housing projects, including ‘Housing’ (housing, bungalows, flats, apartments etc.) and ‘Accommodation’ (sheltered accommodation, care homes, extra care (e.g. dementia) student accommodation etc.) WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value banded sub-lots structure within each county (and the 'all counties 1-9' (Super-lot)), for delivery of developments of varying sizes: up to 5 units; 5 – 15 units; 16 – 49 units; 50 units and above. It may be that a specialist lot within each county will be included to provide for the construction of Accommodation, in addition to the 4 value-banded lots which would then be specifically for the construction of Housing. A separate ‘Super-lot’ for Accommodation may also be appropriate on this basis. The Framework may also provide for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. Again, this may be included as a specialist additional lot within each county and an associated ‘Super-lot’.

Timeline

  1. Completed: Pre-tender published1 October 2019
    Current notice

About the buyer

LHC is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 09323000 · District heating
  • 45211000 · Construction work for multi-dwelling buildings and individual houses
  • 45212000 · Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
  • 45215200 · Construction work for social services buildings
  • 71321100 · Construction economics services
  • 85311000 · Social work services with accommodation

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

79 similar open tenders

See more open tenders related to Construction work for multi-dwelling buildings and individual houses.

Explore all open tenders

Related buyers

Buyers similar to LHC.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.