Research on the costs associated with implementing tighter standards for new build
Details
- Value
- GBP 50,000
- Topic
- Research and development services and related consultancy services
- Published
- 31 January 2018
- Submission
- 21 February 2018
- Source
- ContractsFinder
Tender description
Heating and hot water for UK buildings make up around 40% of our energy consumption and 20% of our greenhouse gas emissions. It will be necessary to largely eliminate these emissions by around 2050 to meet the targets in the Climate Change Act and to maintain the UK contribution to international action under the Paris Agreement. Our advice in this area has been set out in a range of publications including our 2015 Sectoral scenarios for the fifth carbon budget, and more recently Next Steps for UK Heat Policy, our 2017 Report to Parliament and our Independent assessment of the UK's Clean Growth Strategy. We have used these reports to reiterate the importance of developing options to allow near-zero emissions in buildings by 2050 and of setting appropriate standards. Whilst the least-cost mix of technologies to remove emissions from heating is not yet known, it is likely to require both high standards of energy efficiency and the installation of low carbon heating systems (such as heat pumps, connections to heat networks, or conversion to hydrogen). The carbon savings which can be delivered through buildings are not just limited to those 'operational' savings associated with decarbonising heating, or reducing the use of electricity. In addition there is potential to deliver further abatement through the materials and construction methods used in the building itself. In particular, the use of wood in construction can both displace carbon intensive alternatives such as steel and store biogenic carbon. To meet current housing needs and accommodate a growing population, up to 5 million new homes may need to be built by 2030 and 8 million by 2050 (around a fifth of the housing stock). Action is needed urgently to ensure that these new buildings are fit for the future, avoiding the need for costly retrofit. This means ensuring they are able to deliver the necessary carbon savings, alongside high levels of comfort and reduced bills for householders. A range of policy ambitions have been set out in the Government's Clean Growth Strategy, including a commitment to consult in 2019 on improving standards for new homes and commercial buildings 'where there are cost-effective and affordable opportunities, and where it is safe and practical to do so'. *** Please see Specification for more information ***
Timeline
- Completed: Tender published31 January 2018Current notice
- Completed: Submission date21 February 2018
About the buyer
The Committee On Climate Change is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 73000000 · Research and development services and related consultancy services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov |
34 similar open tenders
See more open tenders related to Research on the costs associated with implementing tighter standards for new build.
- Open tender
Construction Related Consultancy Framework
- Open tender
Expert Partner Panel Procurement 2026
- Open tender
Management Consultancy Dynamic Market
- Open tender
Space Technology Solutions
Related topics
Topics related to Research on the costs associated with implementing tighter standards for new build, ranked by notice volume.
- 2,992£331.6bn
Related buyers
Buyers similar to The Committee On Climate Change.
- 2,642£1.6bn
- 900£19.4bn
- 685£8.8bn
- 470£15.4bn
- 430£3.8bn
- 346£20.4m
- 295£367.1m
- 261£233.9m
- 249£577.5m
- 239£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
