Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Details
- Value
- GBP 1,880,000,000
- Topic
- Ballast
- Published
- 26 January 2018
- Submission
- 21 March 2018
- Source
- TedNotices
Tender description
High Speed Two (HS2) Limited ('HS2 Ltd') is the body responsible for developing and promoting the new highspeed railway system known as High Speed Two (HS2). HS2 will initially run between London and Birmingham (Phase 1) but will subsequently be extended to link Birmingham to Crewe (Phase 2a) and Crewe to Manchester and the West Midlands to Leeds (Phase 2b), (Phase 2a and 2b are subject to HS2 Ltd achieving Royal Assent). The Railway Systems tranche of work incorporates a number of critical disciplines for the HS2 Project, including without limitation the design, construction, commissioning and testing of track, overhead catenary, lineside M & E & tunnels, power, signaling , overhead catenary, lineside M & E & tunnels, power, signaling and communications. This procurement relates to two Lots: and communications. This procurement relates to two Lots: — Lot 1 - Track and Overhead Catenary System (OCS) for a High-Speed Railway, and, — Lot 2 - Tunnel and Lineside M&E and Tunnel Ventilation for a High-Speed Railway. This procurement covers Phase 1 and 2a and is divided into two lots. Lot 1 involves the construction of pre-cast slab track in open routes and pre-cast or insitu slab track in tunnel areas, temporary Railheads/depots together with permanent Infrastructure Maintenance Bases (IMB) & Infrastructure Maintenance Bases Rail (IMBR). The extent of the Lot 1 works include track within stations (physical station construction is outside the scope of this procurement), route sections, twin-bore tunnels and green/cut and cover tunnels. This Lot includes Design, Build, Testing and Commissioning of Track & OCS* including: — Design integration and co-ordination with all other disciplines and Rail Systems packages, — Main Works Civils and Stations contractors, — Installation of Hydraulically Bonded Layer or Concrete Base Layer, — Installation of modular Slab Track System (NOTE: HS2 Ltd’s pre-defined precast slab track system contract (encompassing slab track manufacture) will be novated to the winning Lot 1 bidder), — In-situ and embedded (Euston station), — Installation of Ballasted Track System within depots and at conventional infrastructure fringes, including Under Sleeper Pads, Rail Expansion Joints, Installation of Switches and Crossings as well as associated point operating & detection systems plus points heating, — Track Slab drainage, — Construction of two strategic temporary Railheads (complete with sidings - West Ruislip & Calvert), — Construction of permanent Infrastructure Maintenance Depot at Calvert, Construction of an IMB and an (IMBR) at Stone and West Ruislip, — Cable containment in the open route e.g for High Voltage power systems, — OCS foundations & steelwork, small parts steelwork, support & registration equipment, — In span assemblies including tensioning devices, neutral sections, asset condition monitoring equipment, switches & sectioning arrangements, registration & panning, earthing and bonding, electrification signage, factory and site testing, all assurance documentation including TSI and Common Safety Method (CSM) evidence and interface with HS2 Ltd’s appointed Notified Body (NoBo), and hand-over documentation. The Lot 1 Contractor will be the route-wide ‘Principal Contractor’ responsible for construction integration in the trackside / trace/ railheads / IMD / IMB / IMBR areas including the provision of engineering trains for others from railheads to work locations. The Lot 1 Contractor shall be responsible for the running of the construction railway through to the end of dynamic testing phase prior to the trial running phase. It is intended that the defects date will be 104 weeks after the completion of dynamic testing for the final Area i.e. the final dynamic testing of an Area in Phase 2a being the intended date of completion of the whole of the works. The final detailed arrangements will be as set out in the Invitation To Tender (ITT). HS2 Ltd has contracted with SNCF Reseau to prepare certain OCS system design information, such information will be available in the Invitation To Tender pack. Note: the obligation for the design of the OCS masts / gantries remains solely with Contractor, such design shall be in accordance with constraints set by HS2 Ltd such as the aesthetic look of the masts / gantries in certain areas along the Phase 1 and 2a route. In the event that the future Lot 1 tenderer intends to propose an alternative OCS system that is different to that already procured by HS2 Ltd, such alternative shall be wholly consistent with that being developed by HS2 Ltd and meet the requirements as set out in these procurement documents and reference design which will be available in the Invitation To Tender documentation. The dynamic testing activity is being undertaken across a series of “Areas” and the dynamic testing for the first Area will be completed early in 2025. The Employer will commence the maintenance of assets from the start of the Trial Operations phase in any given Area. The liability date will then be 12 years from the defects date. The Tunnel and Lineside M & E and Tunnel Ventilation Lot is a compilation of several sub-systems including: — tunnel ventilation using large axial fans in shafts (within long tunnels) and jet fans in the shorter tunnels, — longitudinal active and passive fire safety provisions within tunnels, — tunnel cross-passage door assemblies in bored and cut and cover tunnels, — M&E works within cross passages, — tunnel lighting and low voltage (LV) distribution, — all cable containment and cable containment fixings in running tunnels and cross passageways for this Lot and for other Railway Systems packages to utilise, — all fixings for elements procured in this Lot, — longitudinal handrails in tunnels, — wayside lighting in the open route (non-tunnel sections) as required, — security and access arrangements in open route as required. Note: HS2 Ltd has already awarded a Specialist Security Services Contract, however, the Contractor shall be wholly responsible for the security of its Sites and for controlling all access/ egress thereto, and, — this Lot does not include building services and fire systems in shafts and portals or tunnel drainage including pumps. These will be provided in advance by others. There are nine (9) tunnels within HS2 Phase 1. These are located at Wendover, Greatworth, Chipping Warden, Long Itchington, Burton Green, Bromford, Euston, Northolt and the Chilterns. Of these tunnels, approximately 40km of the tunnels is bored with the remaining 8.8km being cut and cover. The boundary of the Tunnel and Line side M&E Lot for Phase 1 commences at Euston Station high-speed termini and extends to Birmingham Curzon Street Station termini. Phase 2a commences at the junction of HS2 Mainline and the spur to the West Coast Mainline at Street Hay. The scope of work includes: — requirements analysis and design, — procurement and supply of all plant and materials and equipment, — logistics and installation, — testing and commissioning (T&C); maintenance prior to handover, — provision of a critical spare parts list, — training; provision of hand-over documentation and technical support services in a specified period from commencement of the Trial Operations phase. It is intended that the defects date will be 104 weeks after the completion of dynamic testing for the final Area - i.e. the intended date of completion of the whole of the works. The dynamic testing activity is being undertaken across a series of “Areas” and the dynamic testing for the first Area will be completed early in 2025. The Employer will commence the maintenance of assets from the start of the Trial Operations phase in any given Area. The liability date will then be 12 years from the defects date. The final detailed arrangements will be assess out in the tender documentation.
Timeline
- Completed: Tender published26 January 2018Current notice
- Completed: Submission date21 March 2018
About the buyer
High Speed Two (HS2) Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 14212310 · Ballast
- 31000000 · Electrical machinery, apparatus, equipment and consumables; lighting
- 31174000 · Power supply transformers
- 31682540 · Substation equipment
- 32000000 · Radio, television, communication, telecommunication and related equipment
- 32412100 · Telecommunications network
- 32524000 · Telecommunications system
- 32571000 · Communications infrastructure
- 34632300 · Electrical installations for railways
- 34940000 · Railway equipment
- 34941200 · Track rails
- 34941600 · Crossovers
- 34941800 · Railway points
- 34944000 · Points heating system
- 34946000 · Railway-track construction materials and supplies
- 34946110 · Rails
- 34947000 · Sleepers and parts of sleepers
- 34993100 · Tunnel lighting
- 39717100 · Fans
- 42512300 · HVAC packages
- 42522000 · Non-domestic fans
- 42961000 · Command and control system
- 42961200 · Scada or equivalent system
- 43500000 · Track-laying vehicles
- 45221000 · Construction work for bridges and tunnels, shafts and subways
- 45230000 · Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
- 45232210 · Overhead line construction
- 45232300 · Construction and ancillary works for telephone and communication lines
- 45234100 · Railway construction works
- 45234112 · Railway depot construction work
- 45234116 · Track construction works
- 45234160 · Catenary's construction works
- 45310000 · Electrical installation work
- 45317200 · Electrical installation work of transformers
- 45317300 · Electrical installation work of electrical distribution apparatus
- 50200000 · Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment
- 71320000 · Engineering design services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
97 similar open tenders
See more open tenders related to Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork.
- Open tender
Western Care Vehicle Servicing DPS 2026
- Open tender
Property Works
- Open tender
DPS for Circuit Solutions
- Open tender
UK DTE Projects (various upcoming)
- Open tender
National Grid Substation Construction
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 2,698£1.7bn
- 906£19.4bn
- 691£8.8bn
- 477£15.4bn
- 433£3.8bn
- 350£20.5m
- 304£370.8m
- 263£233.9m
- 252£578.5m
- 241£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
