Chipping Ongar Primary School
Details
- Value
- GBP 2,200,000
- Topic
- Construction work
- Published
- 9 May 2018
- Source
- ContractsFinder
Tender description
This opportunity relates to the refurbishment of Chipping Ongar Primary School (COPS) as part of the Priority Schools Building Programme Phase 2 (PSBP2). The PSBP2 programme was launched on 1 May 2014 to undertake major rebuilding and refurbishment projects, addressing the needs of schools in poor condition. COPS is a mixed primary school for ages 4 to 11, situated in Greensted Road, Ongar, CM5 9LA. The school consists of two main blocks (EFAA and EFAB) of varying forms and types of construction, located to the northern end of the school site. The blocks are interconnected via a glazed atrium. Hard play areas are located to the east, south and west of the main school blocks, and a playing field to the south. The school site has a total area of approximately 6 acres. The project is to refurbish the existing block EFAA, which has an approximate GIA of 1,410sq/m, in order to achieve the necessary 15 year residual design life applicable to PSBP2 schemes. Block EFAA includes a nursery which is outside of the scope of works. The total funded area for refurbishment represents approximately 1,305sq/m. Block EFAB is outside of the scope of works. Block EFAA was built circa 50 years ago and features traditional construction with cavity brickwork and full-height window panels with aluminium finish and double glazed window units. The key works for the scheme include, but is not limited to: • Replacement of the flat roof finish • Renewal of roof drainage system • Replacement of the majority of window units and repair of retained window units • Renewal of ceiling finishes • Replacement of LTHW radiators and fan convectors. The works will be completed in a phased manner. Initial proposals negate temporary accommodation blocks, with surplus space within the school being used as temporary classroom space. One contractor is required to manage and deliver these work. The successful contractor will be appointed under PCSA to finalise design prior to being appointed via a JCT Design & Build Contract. PCSA appointment is anticipated Jul-18. JCT D&B Contract sign is anticipated Apr-19. Works are anticipated to be completed by Dec-19. The School must remain fully operational for the duration of the works.
Timeline
- Completed: Pre-tender published9 May 2018Current notice
About the buyer
TURNER & TOWNSEND PROJECT MANAGEMENT LIMITED is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45000000 · Construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@turner-townsend-project-management-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@turner-townsend-project-management-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@turner-townsend-project-management-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@turner-townsend-project-management-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@turner-townsend-project-management-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@turner-townsend-project-management-limited.gov |
122 similar open tenders
See more open tenders related to Chipping Ongar Primary School.
- Open tender
Property QUDM
- Open tender
Fair Park Regeneration
- Open tender
Southern Construction Framework (SCF-6)
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
UK DTE Projects (various upcoming)
Related topics
Topics related to Chipping Ongar Primary School, ranked by notice volume.
- 1,716£125.8bn
- 173,470£11.6tn
- 92,792£10.4tn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
