Closed tender

RSSB 2413 - Loading requirements for Track Systems - Work package 2 - Development of a methodology to determine loading regimes for track designers - Extension of Deadline to Friday 11th August

Details

Value
GBP 270,000
Topic
Research and development services and related consultancy services
Published
4 August 2017
Submission
11 August 2017

Tender description

The design of track systems is continually developing, using combinations of different materials, improved manufacturing processes and construction techniques. Track systems are increasingly required to carry a wider range of traffic and vehicle types and therefore need to be tailored to suit a range of variables. Whilst experience and evolution of design practice has taught track designers which combinations of components can work there is not an agreed set of loading requirements that can be used to help clients and designers install a demonstrably optimum arrangement of track parameters that can deliver the required performance of the track system over its design life. To support the GB rail industry, the first phase of an in-depth study of the track loading requirements to determine an appropriate set of parameters for design of track systems has been undertaken. This included a literature review covering the origins and application of track and bridge loading, loading practice adopted for other transport assets (e.g; highway pavements), and compilation of project and customer experience, with input from experts in vehicle and structural dynamic load modelling, and bridge and track design. [The first report is available on SPARK (https://www.sparkrail.org), RSSB's rail knowledge hub. The report can be accessed by searching for "T1073" on SPARK or visiting the page https://www.sparkrail.org/Lists/Records/DispForm.aspx?ID=24275. In order to download the report, you will need to register for SPARK. This is free of charge and available to all.] The aim of this work pa The objectives apply to the track support system from the top of the rail to the subgrade. The objectives of the work package are: 1. To develop a methodology for determination of appropriate load models for the design of track systems. The methodology should take in to account the associated key variables identified in Phase 1, including, axle weight, speed, track geometry (specifically curvature and associated cant effects) and variation in wheel and track condition and trackbed resistance. 2. To determine the maximum vertical, horizontal and longitudinal loads likely to be encountered for the rolling stock parameters considered and which should be applied for the design of particular track systems. 3. To determine the primary structural characteristics of track systems and their potential influence on the magnitude of the forces that are applied or the load effects that should be considered (e.g; influence length, resonance etc) to the track in the design process. 4. To determine for the primary load cases, the appropriate combinations of vertical, lateral and longitudinal loads due to railway traffic, and the influence of the associated environmental load due to wind (quasi-static load). 5. To develop guidance on the application of the methodology referred to in 1, taking account of objectives 2, 3, and 4. 6. To provide an independent verification of the models.

Timeline

  1. Completed: Tender published4 August 2017
    Current notice
  2. Completed: Submission date11 August 2017

About the buyer

Rail Safety and Standards Board Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 73000000 · Research and development services and related consultancy services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

33 similar open tenders

See more open tenders related to RSSB 2413 - Loading requirements for Track Systems - Work package 2 - Development of a methodology to determine loading regimes for track designers - Extension of Deadline to Friday 11th August.

Explore all open tenders

Related topics

Topics related to RSSB 2413 - Loading requirements for Track Systems - Work package 2 - Development of a methodology to determine loading regimes for track designers - Extension of Deadline to Friday 11th August, ranked by notice volume.

View all topics
TopicCountValue
  1. 4,170
    £124.0bn

Related buyers

Buyers similar to Rail Safety and Standards Board Ltd.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.