Construction work for university buildings
Details
- Supplier(s)
- Carillion Construction Limited
- Value
- GBP 245,000,000
- Topic
- Construction work for university buildings
- Published
- 27 April 2017
- Source
- TedNotices
Tender description
The University has appointed a contractor to deliver the Fallowfield Student Residential Services Contract. The University aims to significantly enhance the student experience through a replanning of the Fallowfield Campus, diversifying the range of services and facilities — creating a vibrant student village with hub facilities that support residents on site and the student population within the wider Fallowfield area. The Campus currently comprises; 3,251 student Bedrooms; the Central Catering Unit for the whole of the university and local site maintenance, (The Limes); one of the University's main sports facilities, the Armitage Centre; a conference centre and hotel, Chancellors; and the Firs Experimental Gardens. Much of the residential accommodation on the Fallowfield site dates from the 1960's and does not now meet the expectations of students or their parents. The site is underutilised and is capable of accommodating additional student numbers which in turn would support the provision of new, essential support facilities, for example new student hub facilities, which would also serve the needs of the wider student population in the Fallowfield area. The University's goal is to enhance the strengths of the Campus by replacing much of the existing accommodation with modern and well-designed residences that meet the needs of students today and in the future, complemented with the right support services and amenities. The Vision for the Fallowfield Residential campus is: to design, construct and operate the campus in a manner that protects the environment and the health and safety of the students, employees and the public, that conserves natural resources and energy and promotes the health and safety of the University of Manchester community; financially and commercially viable — a development that ‘takes care of itself’; a unique, vibrant, modern student village that is a showcase for potential students — a place where everyone wants to live; diverse range of residential offers, a great range of facilities — a place for everyone; enhances with the wider Fallowfield area and encourages community — a place where everyone has a sense of belonging; development which can be built and maintained safely, easily and phased — a construction project that minimises disturbance to residents, users and neighbours; high quality design that is cost effective, durable, well considered and can be maintained and operated easily and efficiently — a place that lasts; and contributes to local employment and skills — a project the identifies and creates opportunities to benefit Manchester. The scope of the Fallowfield Student Residences Phase 1 project comprises: preparation of site as required to facilitate new buildings and infrastructure; 1,122 Cluster Flat Study bedrooms in 8Nr Blocks, (including Pastoral Units) 1 no. Warden's Apartment An Amenity Hub within cluster flat Block 108 Stand-alone replacement of the existing Central Processing Unit (CPU) / Maintenance building Associated Energy Centre Associated landscaping Harmonisation works across the wider site to include landscaping and signage works CCTV link to existing location Should the University choose to instruct the Contractor to undertake the Phase 2 and Phase 3 works these works are likely to be comprise of the following: Phase 2 Overview — Demolition of existing Oak House buildings and The Limes (CPU and Maintenance Unit) including temporary site hoarding and access arrangements to retained buildings; — 1,191 study bedrooms. — 492 Townhouse Study Bedrooms. — 699 Cluster Flat Study Bedrooms. — Amenity Block. — Wardens House. — Central Hub. — Associated Landscaping + pubic realm works. — Associated Energy Centre. Phase 3 Overview — Demolition of existing Owens Park buildings including the tower including temporary site hoarding and access arrangements to retained buildings; — 896 Cluster Flat Study Bedrooms. — Amenity Block. — Commercial / Retail space + parking. — Associated Landscaping and public realm. Phase 3 Overview — Demolition of existing Owens Park buildings including the tower including temporary site hoarding and access arrangements to retained buildings; — 896 Cluster Flat Study Bedrooms. — Amenity Block. — Commercial / Retail space + parking. — Associated Landscaping and public realm works. — Associated Energy Centre.
Timeline
- Completed: Award date5 April 2017
- Completed: Award published27 April 2017Current notice
About the buyer
The University of Manchester is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45214400 · Construction work for university buildings
- 45215214 · Residential homes construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@the-university-of-manchester.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@the-university-of-manchester.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@the-university-of-manchester.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@the-university-of-manchester.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@the-university-of-manchester.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@the-university-of-manchester.gov |
5 similar open tenders
See more open tenders related to Construction work for university buildings.
- Open tender
BuildDPS - Main Contractor Framework
Related buyers
Buyers similar to The University of Manchester.
- 338£19.4m
- 270£317.1m
- 136£196.2m
- 125£173.6m
- 114£48.2m
- 112£11.7m
- 106£64.4m
- 101£60.1m
- 96£27.7m
- 85£83.4m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
