Hybrid Heat Pumps
Details
- Buyer
- Department for Business Energy and Industrial Strategy (BEIS)
- Value
- GBP 80,000
- Topic
- Research and development services and related consultancy services
- Published
- 8 March 2017
- Submission
- 17 March 2017
- Source
- ContractsFinder
Tender description
Notice summary: The Department for Business, Energy & Industrial Strategy (BEIS) wishes to commission a project to advance our understanding of the potential role of hybrid heat pump (HHP) systems (as defined below) in long-term heat decarbonisation. Heat refers to any energy that is used, or might be used, for the purposes of heating or cooling in buildings, including cooking, providing hot water and in industrial processes. The Climate Change Act places a statutory obligation on the UK Government to make an 80% reduction in 1990 greenhouse gas emissions by 2050. Achieving nearly zero carbon heating continues to be identified by government analysis as an important feature of any lowest cost pathway to 2050. Heat currently accounts for ~48% of UK energy consumption and approximately one third of our greenhouse gas emissions. On the 14th December 2016, Baroness Neville Rolfe gave a speech at the Policy Exchange's Heat Summit on heat decarbonisation. For more information see Baroness Neville Rolfe's keynote speech from the Policy Exchange event "The Heat Summit: How Can We Decarbonise Heating?" Description: Hybrid Heat Pumps project is looking to provide insight and new evidence on the extent to which Hybrid Heat Pumps could play a key role in long-term decarbonisation of heat. The objectives of the project are: • To understand the current in-situ performance of hybrid heat pumps; • To develop robust assumptions of performance and cost (capital and running) changes to 2050 in light of various scales of deployment and product innovation; • To assess potential for innovation to drive changes to hybrid heat pump technology through to 2050 and make HHPs an increasingly attractive consumer proposition (in particular when compared to standard electric heat pumps). For the purposes of this study, hybrid technologies are defined as systems combining an electric driven air or ground source heat pump with a gas boiler (including dedicated controls). Specific appliances under review should include split and integrated packaged systems as well as add-on solutions. The precise research questions that we are looking for the contractor to address are included in the ITT document attached. The contractors will be invited to propose a methodology which would best meet the overall aim and objectives above for approval by BEIS. The work is expected to include, but may not be limited to, the following methods: • Collation, analysis and comparison of relevant product and performance data; • Literature and previous studies review; • Industry consultation/expert interviews and opinion (expected to include product designers, manufacturers, installers, technical experts, trade bodies, researchers and academia); • Analysis, synthesis and modelling; • Documentation.
Timeline
- Completed: Tender published8 March 2017Current notice
- Completed: Submission date17 March 2017
About the buyer
Department for Business Energy and Industrial Strategy (BEIS) is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 73000000 · Research and development services and related consultancy services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@department-for-business-energy-and-industrial-strategy-beis.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@department-for-business-energy-and-industrial-strategy-beis.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@department-for-business-energy-and-industrial-strategy-beis.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@department-for-business-energy-and-industrial-strategy-beis.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@department-for-business-energy-and-industrial-strategy-beis.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@department-for-business-energy-and-industrial-strategy-beis.gov |
32 similar open tenders
See more open tenders related to Hybrid Heat Pumps.
- Open tender
Expert Partner Panel Procurement 2026
- Open tender
Management Consultancy Dynamic Market
- Open tender
Space Technology Solutions
Related topics
Topics related to Hybrid Heat Pumps, ranked by notice volume.
- 2,992£331.6bn
- 4,068£249.4bn
Related buyers
Buyers similar to Department for Business Energy and Industrial Strategy (BEIS).
- 1,496£58.1bn
- 731£1.3bn
- 675£133.0bn
- 637£160.0bn
- 446£8.1bn
- 334£7.4bn
- 324£1.3bn
- 272£1.1bn
- 252£892.4m
- 224£483.9m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
