Construction work
Details
- Buyer
- LHC
- Supplier(s)
27 suppliers
- A.C. Whyte & Co. Ltd.
- Aaron Service Ltd
- Absolute Solar and Wind
- Active Energy Funding Limited
- Anglian Building Products (a division of Anglian Windows Ltd)
- Anglian Group Norfolk
- Aran Services Ltd Suffolk
- Aspiration Energy Limited
- British Gas Social Housing Ltd
- British Gas Trading Ltd (CENTRICA PLC)
- Campbell and Kennedy Ltd
- Cornerstone East Anglia Limited
- E.ON Energy Solutions Limited West Midlands
- Everwarm Ltd West Lothian
- ForWorks
- Insta Group Limited
- K & T Heating Services Limited
- Mears Limited trading as Mears New Homes
- Osborne Energy Ltd
- Polyteck Building Services Limited LONDON
- SERS Energy Solutions Ltd
- SURE MAINTENANCE GROUP LIMITED
- Thexton Properties Ltd
- THRIFT ENERGY LIMITED
- Turner Facilities Management Limited
- VolkerLaser Ltd
- WATES CONSTRUCTION LIMITED
- Value
- GBP 1,300,000,000
- Topic
- Solar photovoltaic modules
- Published
- 10 June 2016
- Source
- TedNotices
Tender description
The contract notice has x 5 Lots. Lot 3, 4, 5 and 6. Work-stream 2 Individual Energy Efficiency Measures and Lot 7 Work-stream 3 Energy Efficiency Measures and Refurbishment. (Work-stream 1 has a separate Service Notice for Energy Consultants and Project Management). This award applies for Lot 3, 4, 5, 6 Work-stream 2 — Energy Efficiency Measures works, including but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units, Traditional Boilers, Heating Circuits and Project Management of these works. Work-stream 3 was awarded under Contract Notice 2016/s 048-079097. Lot 3 — Work-stream 2 — Energy Efficiency Measures and/or Refurbishment works, including but not limited to the following services: the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units,Traditional Boilers Heating Circuits and Refurbishment work including the Project Management of these works: Lot 3A — External Wall Insulation. Lot 3 — Work-stream 2 — Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services: the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units,Traditional Boilers Heating Circuits and Refurbishment work including the Project Management of these works. Lot 3B — Cavity Wall Insulation. Lot 3 — Work-stream 2 — Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services: the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units,Traditional Boilers Heating Circuits and Refurbishment work including the Project Management of these works. Measure C — Internal Wall Insulation. Lot 3 — Work-stream 2 — Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services: the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units,Traditional Boilers Heating Circuits and Refurbishment work including the Project Management of these works. Measure D — Insulation. Lot 3 — Work-stream 2 — Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services: the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units,Traditional Boilers Heating Circuits and Refurbishment work including the Project Management of these works. Measure E — Biomass Boilers Insulation. Lot 3 — Workstream 2 -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units,Traditional Boilers Heating Circuits and Refurbishment work including the Project Management of these works: Measure F — Solar Photo Voltaic. Lot 3 — Workstream 2 -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units,Traditional Boilers Heating Circuits and Refurbishment work including the Project Management of these works: Measure G — Air Source Heat Pumps. Lot 3 — Workstream 2 -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Interface Units,Traditional Boilers Heating Circuits and Refurbishment work including the Project Management of these works: Lot 3 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Traditional Boilers: Lot 4 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works::- Measure A — External Wall Insulation. Lot 4 —Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure B — Cavity Wall Insulation. Lot 4 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure C — Internal Wall Insulation. Lot 4 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works: Measure D — Insulation: Lot 4 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure E — Biomass Boilers. Lot 4 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure F — Solar Photo Voltaic. Lot 4 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure G — Air Source Heat Pumps. Lot 4 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure H — Heat Interface Units. Lot 4 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure I- Traditional Boilers. Lot 5 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:-Measure A- External Wall Insulation. Lot 5 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure B- Cavity Wall Insulation. Lot 5 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure C- Internal Wall Insulation. Lot 5 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure D- Insulation. Lot 5 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure E- Biomass Boilers. Lot 5— Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure F- Solar Photo Voltaic. Lot 5— Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure G- Air Source Heat Pumps. Lot 5 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure H- Heat interface Units. Lot 5 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure I- Traditional boilers. Lot 6— Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure A- External Wall Insulation. Lot 6 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure B- Cavity Wall Insulation. Lot 6— Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure C- Internal Wall Insulation. Lot 6 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure D- Insulation. Lot 6 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure E- Biomass Boilers. Lot 6 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure F- Solar Photo Voltaic. Lot 6 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works::- Measure G- Air Source Heat Pumps. Lot 6— Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure H- Heat Interface Units. Lot 6 — Workstream 2 Individual -Energy Efficiency Measures and/or Refurbishment works, including, but not limited to the following services, the supply and installation of External Wall Insulation, Cavity Wall Insulation, Internal Wall Insulation, Insulation materials, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Heat Inter face Units, Traditional Boilers and Heating Circuits works:- Measure I- Traditional Boilers.
Timeline
- Completed: Award date1 June 2016
- Completed: Award published10 June 2016Current notice
About the buyer
LHC is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 09331200 · Solar photovoltaic modules
- 09332000 · Solar installation
- 42511110 · Heat pumps
- 44620000 · Central-heating radiators and boilers and parts
- 45000000 · Construction work
- 45320000 · Insulation work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@lhc.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@lhc.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@lhc.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@lhc.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@lhc.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@lhc.gov |
145 similar open tenders
See more open tenders related to Construction work.
- Open tender
Property QUDM
- Open tender
Fair Park Regeneration
- Open tender
Plumpton Sports Pavilion
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
UK DTE Projects (various upcoming)
Related buyers
Buyers similar to LHC.
- 122£121.6bn
- 79£1.9bn
- 42£6.0bn
- 27£1.8bn
- 20£10.8m
- 19£6.1bn
- 13£1.8bn
- 139£402.6m
- 49£6.8bn
- 5£2.6m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
