Research Study into impact of mine water discharges on marine ecology – Bioaccumulation study & Intertidal ecology survey
Details
- Buyer
- The Coal Authority
- Supplier(s)
- Institute of Estuarine and Coastal Studies
- Value
- GBP 7,500
- Duration
- 9 months
- Topic
- Design and execution of research and development
- Published
- 7 April 2016
- Source
- ContractsFinder
Tender description
Work Package 1: Metal Bioaccumulation Study 1) Undertake preliminary study to determine levels of metal bioaccumulation in the intertidal zone as soon as possible (May 2016). This survey is expected to incorporate sampling of bio-indicator species and sediments from the intertidal zone in the vicinity of the mine water discharge and at a control location. 2) Undertake a repeat survey in November or December 2016 to assess any changes in metal bioaccumulation within the selected bio-indicator species 3) Preparation of technical reports 4) Project Management Work Package 2: Intertidal Ecology Study An ecological survey is required in November or December 2016 to gather data on the biotopes present within the intertidal survey area. The results are to be compared with the baseline ecological survey conducted in December 2013. The scope is outlined as follows: 1) Undertake Intertidal Ecology Study to include: 2) Preparation of technical reports: 3) Project Management
Timeline
- Completed: Award published7 April 2016Current notice
- Completed: Award date11 May 2016
- Completed: Contract expiry date1 February 2017
About the buyer
The Coal Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 73300000 · Design and execution of research and development
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@the-coal-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@the-coal-authority.gov |
3 similar open tenders
See more open tenders related to Research Study into impact of mine water discharges on marine ecology – Bioaccumulation study & Intertidal ecology survey.
Related topics
Topics related to Research Study into impact of mine water discharges on marine ecology – Bioaccumulation study & Intertidal ecology survey, ranked by notice volume.
- 1,602£4.0bn
Related buyers
Buyers similar to The Coal Authority.
- 2,594£1.6bn
- 880£19.4bn
- 677£8.8bn
- 461£15.4bn
- 423£3.8bn
- 339£20.2m
- 290£366.8m
- 256£233.2m
- 246£577.4m
- 232£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
