Large Scale Non-Battery based Electrical Energy Storage Systems
Details
- Topic
- Engineering design services
- Published
- 27 January 2026
- Submission
- 24 March 2026
- Source
- uk:find_a_tender
Tender description
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. STEP is currently in its Concept Design phase, which is expected to be completed by 2026. The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants. These parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity. The highly dynamic nature of these loads could make compliance with grid code requirements challenging. For more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society UKIFS is seeking experts to support the technology selection of a Central Energy Storage System (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and the operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters. Rather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant. The CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection. The scope of the CESS cannot be fully defined due to knowledge gaps in CESS behaviour and limitations. Once these are understood, a technology will be selected, and limitations will be incorporated into the electrical infrastructure design. This PME is looking to address the knowledge gaps. The proposed technical and operations of the CESS are •2 operational cycles per day •Pulse length will be over 1 hour (continuous) •Power range larger than 300MW •Energy capacity 100-300MWh •Response in the millisecond range •Similar charge and discharge rates. •Fast response time during power swings (full charge to discharge) •High round trip efficiency: 80% In conjunction the CESS will be required to be operated and maintained for the 20-year life of the STEP machine. Due to the requirements, we are attempting to ascertain if this could be accomplished or partly accomplished by a non-battery-based system (Flywheel, Super-conducting magnetic storage (SMES), Capacitor, Super Capacitor, Fuel Cells or other) For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./W8UFJUNW28 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/W8UFJUNW28
Timeline
- Completed: Pre-tender published27 January 2026Current notice
About the buyer
UK Atomic Energy Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71320000 · Engineering design services
- 71323100 · Electrical power systems design services
- 71323200 · Plant engineering design services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov |
9 similar open tenders
See more open tenders related to Large Scale Non-Battery based Electrical Energy Storage Systems.
- Open tender
DPS 2025 - Integrated Design Team
- Open tender
Housing Maintenance & Repair
- Open tender
Construction Professional Services DPS
- Open tender
Refurbishment work
Related topics
Topics related to Large Scale Non-Battery based Electrical Energy Storage Systems, ranked by notice volume.
- 171,572£11.5tn
- 91,999£10.3tn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
