Legacy Concrete Roads Reconstruction Framework
Details
- Supplier(s)
- Kier Construction Limited, John Graham Construction Limited R7: 1C 2C 3C 4C 5C 6C 7C 8C, John Sisk & Son (Holdings) Ltd
- Value
- £968,000,000
- Topic
- Construction, foundation and surface works for highways, roads
- Published
- 3 March 2026
- Source
- uk:find_a_tender
Tender description
National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes: • design and subsequent construction services for: - demolition of existing concrete pavements, - reconstruction of pavements (including new pavement furniture and markings) • design and delivery of associated temporary traffic management solutions, • when instructed: - involvement in optioneering, - design and construction of alterations to those legacy assets which interface with the replacement pavements’ designs, which may include sub-surface drainage, street furniture and its foundations and signage, - design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings), • performing principal designer and principal contractor duties as defined under the “Construction (Design and Management) Regulations 2015” (“CDM Regulations 2015”) • carbon capture recording and reporting, • recovery, recycling and reuse of arisings during the delivery of a scheme, • engagement with all identified stakeholders, and • identification, recording and realisation of programme efficiencies. The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4. This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations. From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement. Works will be allocated as per the Framework Information document. Lot 1: National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes: • design and subsequent construction services for: - demolition of existing concrete pavements, - reconstruction of pavements (including new pavement furniture and markings) • design and delivery of associated temporary traffic management solutions, • when instructed: - involvement in optioneering, - design and construction of alterations to those legacy assets which interface with the replacement pavements’ designs, which may include sub-surface drainage, street furniture and its foundations and signage, - design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings), • performing principal designer and principal contractor duties as defined under the “Construction (Design and Management) Regulations 2015” (“CDM Regulations 2015”) • carbon capture recording and reporting, • recovery, recycling and reuse of arisings during the delivery of a scheme, • engagement with all identified stakeholders, and • identification, recording and realisation of programme efficiencies. The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4. This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations. From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement. Works will be allocated as per the Framework Information document.
Timeline
- Completed: Award date9 February 2026
- Completed: Award published3 March 2026Current notice
About the buyer
National Highways Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45233000 · Construction, foundation and surface works for highways, roads
- 45233100 · Construction work for highways, roads
- 45233110 · Motorway construction works
- 45233120 · Road construction works
- 45233121 · Main road construction works
- 45233122 · Ring road construction work
- 45233124 · Trunk road construction work
- 45233125 · Road junction construction work
- 45233126 · Grade-separated junction construction work
- 45233128 · Roundabout construction work
- 45233130 · Construction work for highways
- 45233131 · Construction work for elevated highways
- 45233139 · Highway maintenance work
- 45233140 · Roadworks
- 45233141 · Road-maintenance works
- 45233142 · Road-repair works
- 45233144 · Overpass construction work
- 45233210 · Surface work for highways
- 45233220 · Surface work for roads
- 45233221 · Road-surface painting work
- 45233222 · Paving and asphalting works
- 45233223 · Carriageway resurfacing works
- 45233224 · Dual carriageway construction work
- 45233225 · Single carriageway construction work
- 45233226 · Access road construction work
- 45233227 · Slip road construction work
- 45233228 · Surface coating construction work
- 45233251 · Resurfacing works
- 45233280 · Erection of road-barriers
- 45233290 · Installation of road signs
- 45233292 · Installation of safety equipment
- 45233294 · Installation of road signals
- 45233300 · Foundation work for highways, roads, streets and footpaths
- 45233310 · Foundation work for highways
- 71320000 · Engineering design services
- 79415200 · Design consultancy services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov |
44 similar open tenders
See more open tenders related to Legacy Concrete Roads Reconstruction Framework.
- Open tender
DPS 2025 - Integrated Design Team
Related buyers
Buyers similar to National Highways Limited.
- 2,351£1.6bn
- 592£8.7bn
- 422£15.4bn
- 391£3.7bn
- 302£18.9m
- 263£361.8m
- 227£228.9m
- 219£424.8m
- 217£10.1bn
- 148£44.6m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.