Capel Curig / Crafnant Bridleway Restoration
Details
- Supplier(s)
- R.L Davies(Plant Hire Ltd)
- Topic
- Footpath construction work
- Published
- 21 October 2025
- Source
- uk:sell2wales
Tender description
Scope of WorksThe work specified within this tender is situated between Llyn Crafnant and the A5 trunk road at Capel Curig. The purpose of the work is to improve the existing R.O.W. infrastructure between the Ogwen and Conwy valleys and to significantly reduce the risk of further degradation and erosion of this fragile landscape.The work will be undertaken in accordance with accepted and long-established good working practices. Construction techniques will be environmentally sound and will focus on sustainable construction, with minimal future maintenance costs. It is crucial that the paths have minimal visual impact on the landscape and should provide the user with an intimate experience of the surrounding area. The path should work with the terrain rather than working through it.The construction will be of a solid surface technique (dictated by the terrain and underlying geology) with extensive sections of aggregate surfacing, and some sections requiring partial floating over soft terrain. Some sections will also require significant drainage management (to minimise impediment and maintain the natural flow) necessitating in the construction of cross culverting and ballast filled side drainage (approx. 90% of drainage construction will utilise the pre-existing and extensive ditching network to be found on site). Further works will include the replacement of gates.
Timeline
- Completed: Award date19 October 2021
- Completed: Award published21 October 2025Current notice
About the buyer
Snowdonia National Park Authority/Awdurdod Parc Cenedlaethol Eryri is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45233161 · Footpath construction work
- 45233253 · Surface work for footpaths
- 45233340 · Foundation work for footpaths
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@snowdonia-national-park-authority-awdurdod-parc-cenedlaethol-eryri.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@snowdonia-national-park-authority-awdurdod-parc-cenedlaethol-eryri.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@snowdonia-national-park-authority-awdurdod-parc-cenedlaethol-eryri.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@snowdonia-national-park-authority-awdurdod-parc-cenedlaethol-eryri.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@snowdonia-national-park-authority-awdurdod-parc-cenedlaethol-eryri.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@snowdonia-national-park-authority-awdurdod-parc-cenedlaethol-eryri.gov |
6 similar open tenders
See more open tenders related to Capel Curig / Crafnant Bridleway Restoration.
- Open tender
Highways Materials DPS
- Open tender
Highways Materials DPS
- Open tender
Road Surface Treatments - DPS
Related topics
Topics related to Capel Curig / Crafnant Bridleway Restoration, ranked by notice volume.
- 11,175£1.0tn
- 26,970£1.7tn
Related buyers
Buyers similar to Snowdonia National Park Authority/Awdurdod Parc Cenedlaethol Eryri.
- 12£119.9k
- 9£1.1m
- 8—
- 388£10.0bn
- 105£1.4bn
- 104£762.9m
- 94£1.9bn
- 91£6.2m
- 78£866.9m
- 72£195.3m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.