Tate - Tate Modern Blavatnik L2 South Gallery re-design - Creating a flexible and sustainable exhibition space
Details
- Buyer
- Tate Gallery
- Value
- GBP 250,000
- Topic
- Architectural, construction, engineering and inspection services
- Published
- 13 January 2025
- Submission
- 7 February 2025
- Source
- uk:find_a_tender
Tender description
Last financial year, a large proportion of Tate Modern’s Curatorial budget was spent on alternations of the gallery spaces, mainly dismantling and re-building walls, to suit the layout requirements for each exhibition. This practise also contributes to one of the largest portions of the carbon footprint generated by exhibitions production. Tate Modern would like to turn this challenge into an opportunity, where we are taking advantage of a completely empty space to design a new gallery that could be adapted for multiple exhibition projects in a low cost and circular way. This project will commission specialised designers to design a set of modular, movable and re-configurable walls to use in Blavatnik L2 South Gallery. This would allow us to respond to project-specific spatial needs by achieving multiple layouts with flexible setworks, making substantial efficiencies in construction costs, materials, labour and waste. Lot 1: Last financial year, a large proportion of Tate Modern’s Curatorial budget was spent on alternations of the gallery spaces, mainly dismantling and re-building walls, to suit the layout requirements for each exhibition. This practise also contributes to one of the largest portions of the carbon footprint generated by exhibitions production. Tate Modern would like to turn this challenge into an opportunity, where we are taking advantage of a completely empty space to design a new gallery that could be adapted for multiple exhibition projects in a low cost and circular way. This project will commission specialised designers to design a set of modular, movable and re-configurable walls to use in Blavatnik L2 South Gallery. This would allow us to respond to project-specific spatial needs by achieving multiple layouts with flexible setworks, making substantial efficiencies in construction costs, materials, labour and waste. These new design interventions in Blavatnik L2 South Gallery will enable us to pilot new ways of working in exhibition productions, providing a template that could be applied to other spaces at Tate Modern and other sites. This will also highlight Tate as a leader in developing new approaches to sustainable and circular exhibition production approaches for the wider art sector.
Timeline
- Completed: Tender published13 January 2025Current notice
- Completed: Submission date7 February 2025
About the buyer
Tate Gallery is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71000000 · Architectural, construction, engineering and inspection services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@tate-gallery.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@tate-gallery.gov |
65 similar open tenders
See more open tenders related to Tate - Tate Modern Blavatnik L2 South Gallery re-design - Creating a flexible and sustainable exhibition space.
- Open tender
DPS for Interim Remediation Works
- Open tender
Space Technology Solutions
Related buyers
Buyers similar to Tate Gallery.
- 2,594£1.6bn
- 880£19.4bn
- 677£8.8bn
- 461£15.4bn
- 423£3.8bn
- 339£20.2m
- 290£366.8m
- 256£233.2m
- 246£577.4m
- 232£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
