T0680 Validation of integral bridge abutment design methods - phase 3
Details
- Supplier(s)
- AtkinsRéalis UK Limited
- Value
- GBP 149,152.68
- Duration
- 5 years
- Topic
- Development consultancy services
- Published
- 2 July 2025
- Source
- uk:contracts_finder
Tender description
This work is looking to provide evidence to improve our understanding of behaviour of integral bridges and validate against numerical modelling and the current BS PD 6694-1 (Recommendations for the design of structures subject to traffic loading to BS EN 1997-1:2004+A1:2013) referenced in CS459 predictions to enable the development of an improved calculation approach for integral bridges more broadly. This will be achieved by capturing and analysing data over a continuous period of 5 years from the time of construction to support investigation of the soil structure interaction and overall bridge performance. Data will then be interpreted to support analysis of the DMRB. The strategic objectives of the project are: - to safely improve the design of construction while reducing capital and carbon costs by more efficient use of materials in future integral bridge construction; - to provide accurate and reliable measurements to understand the total life cycle for these structures; - to extend the span length where these type of structures can be sensibly adopted; - to improve acceptance of this type of structures to further reduce the need for bridge bearings which require periodic disruptive replacement
Timeline
- Completed: Award date11 June 2025
- Completed: Award published2 July 2025Current notice
- Next: Contract expiry date30 March 2030in 4 years
About the buyer
National Highways Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 73220000 · Development consultancy services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov |
7 similar open tenders
See more open tenders related to T0680 Validation of integral bridge abutment design methods - phase 3.
- Open tender
Omega DPS
- Open tender
CHIC Development Dynamic Purchasing System
- Open tender
Lowestoft Dynamic Purchasing System
Related topics
Topics related to T0680 Validation of integral bridge abutment design methods - phase 3, ranked by notice volume.
- 1,745£636.1bn
- 11,175£1.0tn
- 26,970£1.7tn
Related buyers
Buyers similar to National Highways Limited.
- 2,594£1.6bn
- 677£8.8bn
- 461£15.4bn
- 423£3.8bn
- 339£20.2m
- 290£366.8m
- 256£233.2m
- 246£577.4m
- 232£10.1bn
- 168£47.4m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
