Unknown tender

Replacement of the Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface

Details

Topic
Installation services of steam generators, turbines, compressors and burners
Published
5 April 2025

Tender description

The University of Birmingham invites tenders for the Replacement of Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface. <br /><br />The current Waste Heat Boiler panel was built in 1990/91 and controls the operation of a water tube boiler that utilizes the exhaust from a Solar Mercury 50 gas turbine. The exhaust heat enables the university to generate 3500Kg/hr of saturated steam @ 17barG although the boiler is rated at 25barG. There is a supplementary burner within the boiler that can fire from 0.2barG natural gas to 3.5barG which allows the flexibility of the boiler range between 3500Kg to 18000Kg an hour, therefore providing a base load during the winter months.<br /><br />Please refer to Appendix A and associated appendices for the full specification of requirments available via www.intendhost.com/universityofbirmingham <br /><br />The works are to be completed by September 2025.<br /><br />Site visits are essential. These will be arranged via the correspondence feature on the InTend e-procurement portal.

Timeline

  1. Completed: Tender published5 April 2025
    Current notice

About the buyer

University of Birmingham is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 51130000 · Installation services of steam generators, turbines, compressors and burners

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Replacement of the Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface, ranked by notice volume.

View all topics
TopicCountValue
  1. 4,088
    £269.5bn

Related buyers

Buyers similar to University of Birmingham.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.