Supply Chain Notice: WAT0122-02 - 3 Basin Level Management System (via 9 Dock)
Details
- Buyer
- Ministry of Defence
- Value
- GBP 200,000
- Topic
- Electrical installation work of pumping equipment
- Published
- 29 February 2024
- Submission
- 22 March 2024
- Source
- uk:contracts_finder
Tender description
The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in. Project Background 3 Basin is essential infrastructure to PNB. It contains many berths and docks that harbour naval vessels for upkeep and storage. A solution is required to maintain the operational level of the basin between the set parameters. Currently, the basin is seeing abnormal amounts of leakage through various points throughout its boundaries and as such there is a need to replenish this water. This is currently done by opening up 3 basin to the harbour on sufficient high tides, at great expense in terms on labour, and wear on existing aged infrastructure. The system implicated in the notice will be set up at the head of 9 dock and draw water from there (tidal waters) and discharge into 3 Basin at the nearest convenience. This will be going over a main road way, and as such, any pipes, cables etc will need to be ramped over significantly to allow for current traffic to pass over. Any solution that is designed will need to comply with any environmental regulations due to being placed in/above/around tidal waters. The total discharge capacity of the pumps shall be no less than 1800m3/hr. The solution shall also incorporate a system whereby the level in 3 Basin is monitored and the pumps controlled accordingly. Please see picture attached (fig 1) with orange arrow for proposed location (although not explicit if designs vary) and where the water needs to be moved from and to with the blue arrow. The task will be for a fully managed system including equipment to pump the water, fabricated structure to mount the pump(s) include a ramped roadway for any pipework or wiring and fully integrated into the electrical network with a control panel. This will also include maintenance regime according to manufacturers guidance for at least 1 year post installation and a planned proposal for another 2 years minimum with fees. Additional information: Project location HM Naval Base Portsmouth The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes. The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity. KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability. If you are interested in this opportunity, please contact Chris May - at SCWaterfront@kbsmaritime.com to express interest quoting ref EOI - WAT0122-02 - 3 Basin Level Management System (via 9 Dock) Once the notice has closed, suppliers will be invited to Pre-Qualify and/or Invited to Tender. A Non-Disclosure Agreement will also be required, prior to participating in a Pre Qualification and/or Invitation to Tender. Please note KBS publish opportunities via the EU Supply Platform. If you are not already registered, please go to https://uk.eu-supply.com/login.asp?B=UK and click 'New Supplier Registration' and follow the simple and free registering process. Send form to: DefComrclSSM-Suppliers@mod.gov.uk
Timeline
- Completed: Tender published29 February 2024Current notice
- Completed: Submission date22 March 2024
About the buyer
Ministry of Defence is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45317100 · Electrical installation work of pumping equipment
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@ministry-of-defence.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@ministry-of-defence.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@ministry-of-defence.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@ministry-of-defence.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@ministry-of-defence.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@ministry-of-defence.gov |
3 similar open tenders
See more open tenders related to Supply Chain Notice: WAT0122-02 - 3 Basin Level Management System (via 9 Dock).
Related topics
Topics related to Supply Chain Notice: WAT0122-02 - 3 Basin Level Management System (via 9 Dock), ranked by notice volume.
- 11,175£1.0tn
- 26,970£1.7tn
Related buyers
Buyers similar to Ministry of Defence.
- 731£1.3bn
- 675£133.0bn
- 632£159.9bn
- 446£8.1bn
- 334£7.4bn
- 324£1.3bn
- 271£1.1bn
- 252£892.4m
- 222£483.8m
- 178£221.9bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.