AGHS Refactor –Decommissioning Plan
Details
- Topic
- Petroleum products, fuel, electricity and other sources of energy
- Published
- 24 July 2024
- Source
- uk:find_a_tender
Tender description
“AGHS Refactor is a project with an overall aim to upskill UK industry to design, modify and operate tritium plans for fusion by leveraging full UK supply chain. UKAEA’s Active Gas Handling System (AGHS) is designed to supply, recover, process and recirculate the hydrogen isotopes including tritium used by the Joint European Torus (JET). This Request For Information (RFI) scope concerns the de-commissioning of specific AGHS sub-systems including (but not limited to) the specific AGHS Cryogenic-Forevacuum’s and Buffer Tanks. Project outputs expected to be delivered by contractor include: • Conceptual de-commissioning study • Hazard identification – with a specific focus on working safely with tritiated material • Estimation of cost and schedule • Concept design review submitted to UKAEA for comment and review Specified contractor deliverables will be outlined by UKAEA at ITT submission. “ Lot 1: “AGHS Refactor is a project with an overall aim to upskill UK industry to design, modify and operate tritium plans for fusion by leveraging full UK supply chain. UKAEA’s Active Gas Handling System (AGHS) is designed to supply, recover, process and recirculate the hydrogen isotopes including tritium used by the Joint European Torus (JET). This Request For Information (RFI) scope concerns the de-commissioning of specific AGHS sub-systems including (but not limited to) the specific AGHS Cryogenic-Forevacuum’s and Buffer Tanks. Project outputs expected to be delivered by contractor include: • Conceptual de-commissioning study • Hazard identification – with a specific focus on working safely with tritiated material • Estimation of cost and schedule • Concept design review submitted to UKAEA for comment and review Specified contractor deliverables will be outlined by UKAEA at ITT submission. “
Timeline
- Completed: Pre-tender published24 July 2024Current notice
About the buyer
UK Atomic Energy Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 09000000 · Petroleum products, fuel, electricity and other sources of energy
- 24000000 · Chemical products
- 51000000 · Installation services (except software)
- 71000000 · Architectural, construction, engineering and inspection services
- 71300000 · Engineering services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@uk-atomic-energy-authority.gov |
96 similar open tenders
See more open tenders related to AGHS Refactor –Decommissioning Plan.
- Open tender
Property QUDM
- Open tender
Fair Park Regeneration
- Open tender
Construction Related Consultancy Framework
Related topics
Topics related to AGHS Refactor –Decommissioning Plan, ranked by notice volume.
- 1,716£125.8bn
Related buyers
Buyers similar to UK Atomic Energy Authority.
- 2,712£1.7bn
- 913£19.4bn
- 706£8.8bn
- 484£15.4bn
- 437£3.8bn
- 353£20.6m
- 311£371.8m
- 263£233.9m
- 254£580.8m
- 172£48.3m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.