Stale Pre-tender

AGHS Refactor –Decommissioning Plan

Details

Topic
Petroleum products, fuel, electricity and other sources of energy
Published
24 July 2024

Tender description

“AGHS Refactor is a project with an overall aim to upskill UK industry to design, modify and operate tritium plans for fusion by leveraging full UK supply chain. UKAEA’s Active Gas Handling System (AGHS) is designed to supply, recover, process and recirculate the hydrogen isotopes including tritium used by the Joint European Torus (JET). This Request For Information (RFI) scope concerns the de-commissioning of specific AGHS sub-systems including (but not limited to) the specific AGHS Cryogenic-Forevacuum’s and Buffer Tanks. Project outputs expected to be delivered by contractor include: • Conceptual de-commissioning study • Hazard identification – with a specific focus on working safely with tritiated material • Estimation of cost and schedule • Concept design review submitted to UKAEA for comment and review Specified contractor deliverables will be outlined by UKAEA at ITT submission. “ Lot 1: “AGHS Refactor is a project with an overall aim to upskill UK industry to design, modify and operate tritium plans for fusion by leveraging full UK supply chain. UKAEA’s Active Gas Handling System (AGHS) is designed to supply, recover, process and recirculate the hydrogen isotopes including tritium used by the Joint European Torus (JET). This Request For Information (RFI) scope concerns the de-commissioning of specific AGHS sub-systems including (but not limited to) the specific AGHS Cryogenic-Forevacuum’s and Buffer Tanks. Project outputs expected to be delivered by contractor include: • Conceptual de-commissioning study • Hazard identification – with a specific focus on working safely with tritiated material • Estimation of cost and schedule • Concept design review submitted to UKAEA for comment and review Specified contractor deliverables will be outlined by UKAEA at ITT submission. “

Timeline

  1. Completed: Pre-tender published24 July 2024
    Current notice

About the buyer

UK Atomic Energy Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 09000000 · Petroleum products, fuel, electricity and other sources of energy
  • 24000000 · Chemical products
  • 51000000 · Installation services (except software)
  • 71000000 · Architectural, construction, engineering and inspection services
  • 71300000 · Engineering services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

99 similar open tenders

See more open tenders related to AGHS Refactor –Decommissioning Plan.

Explore all open tenders

Related topics

Topics related to AGHS Refactor –Decommissioning Plan, ranked by notice volume.

View all topics

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.