Stale Pre-tender

PRO004738-Works-Contract- MBC Biomethane and CO2 Plant

Details

Value
GBP 30,000,000
Topic
Waste disposal site construction work
Published
24 August 2023

Tender description

UU (United Utilities Water Limited) UU are proposing to install new Gas to Grid upgrading plant with a Biomethane / CO2 carbon capture (liquified) that takes all the on-site generated gas (~ 6000nm3/hr) from our existing Anaerobic digestion storage for export into the gas network. Developing our future strategy we are undertaking pre-market research to understand market offerings for the following services UU are interested in understanding how this model can be delivered, and the best technical solution Responses detailing variations of the above services are welcome. Lot 1: UU (United Utilities Water Limited) UU are proposing to install new Gas to Grid upgrading plant with a Biomethane / CO2 carbon capture (liquified) that takes all the on-site generated gas (~ 6000nm3/hr) from our existing Anaerobic digestion storage for export into the gas network. UU are interested in understanding how this model can be delivered, and the best technical solution Developing our future strategy we are undertaking pre-market research to understand market offerings for the following services Our initial design for the main plant items include the following Responses detailing variations of the above services are welcome. • Dual stream 'Amine solution' Chemical wash plant o 6000Nm3/hr of biogas treatment for export to local gas network o Pre-treatment conditioning of biogas (VOC / Siloxane / H2S removal) o Analytical monitoring / control of gas quality to ensure product is suitable for export • Grid Export Unit (GEU) – kiosk based solution o Arrangement of valves & pipework for the provision of o Isolation / diversion of the gas between export point & flare stack o Biogas flare stack for emergency burning of surplice gas o Analytical monitoring / control of gas quality to ensure product is suitable for export • Remote Operating Valve (ROV) assembly – kiosk based solution o Arrangement of valves & pipework for the provision of o Valve isolation system to prevent the export gas in the event of quality / gas network issues o Analytical monitoring / control of gas quality to ensure product is suitable for export • CO2 capture / recovery Plant (off- gas product of the Chemical Wash Plant) o Liquification & storage o Vehicle export (tanker) loading / filling facility • Propane storage facility o 48Tonnes of liquid propane storage o injection to Biomethane export pipeline o injection / purge points biomethane pipework o injection purge points on H2 boiler feed main o Fire suppression system • Dual fuel boiler (H2 and natural gas) o 9000T steam/hr @ 190oC o Boiler feed water conditioning unit o Housing for boiler • H2 import pipeline to dual fuel boilers o 1km x 400mm2 @ 2bar pipeline direct buried (gas main) o H2/natural gas conversion of 2 x 9000T/hr steam boilers o H2 ring main in boiler house • New electrical feed. o 2MVA 6.6kV/415V 3 phase transformer o HV Ring main unit (RMU) o HV joints / infrastructure interventions o New LV intake board (Form 4) 3 tier system / ACB’s / distribution o HV / LV earthing Additional information: This notice is a request for information only at this stage. If you have experience in this area please could you provide at a minimum the following information and submit to the United Utilities CTS Procurement Team mailbox: CTSProcurement@uuplc.co.uk • Company Name • Contact details, including location telephone and e-mail address, main point of contact and position in Company

Timeline

  1. Completed: Pre-tender published24 August 2023
    Current notice

About the buyer

United Utilities Water Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45222110 · Waste disposal site construction work
  • 45251141 · Geothermal power station construction work
  • 45251220 · Cogeneration plant construction work
  • 45251240 · Landfill-gas electricity generating plant construction work
  • 45252122 · Sewage digesters
  • 45255800 · Gas-production plant construction work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

9 similar open tenders

See more open tenders related to PRO004738-Works-Contract- MBC Biomethane and CO2 Plant.

Explore all open tenders

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.