Tender description
The Authority is in the preparatory stage of the procurement of a contractor/contractors for the decommissioning and demolition of the existing EfW Facility on the Edmonton EcoPark. The procurement (the "EfW Decommission and Demolition Project") consists of works to decommission and demolish existing buildings, structures and plant. Lot 1: The Authority is currently engaged in the North London Heat and Power Project (NLHPP), a programme of works at its EcoPark site in Edmonton, London N18 3AG for the development of a new Energy Recovery Facility (ERF). The Authority has already engaged a contractor and construction works for the new ERF have commenced and are making good progress. The EcoPark site for the ERF works is an operational waste management site where LondonEnergy Ltd (LEL), a private company wholly owned by NLWA, operates an existing EfW Facility. Now that construction works are well underway on the new ERF, the Authority is looking to procure works to decommission and demolish the existing EfW Facility. The Authority is in the preparatory stage of the procurement of a contractor/contractors for these decommissioning and demolition works (referred to as the "EfW Decommission and Demolition Project"). The works to be carried out for the EfW Decommission and Demolition Project shall include: (i) Enabling and preparatory works; (ii) Site access and handover; (iii) Site establishment and set up including installation of hoarding to the work area; (iv) Utilities isolation and disconnection; (v) Asbestos removal; (vi) Removal of redundant utilities, electrical cabinets, switchgear, transformers, generators, electrical and control cables, control cabinets, PLCs and transformers; (vii) Soft strip including but not limited to removal of redundant building contents and plant such as: • Overhead cranes (waste cranes / turbine hall crane / workshop crane) • Furnace, boilers and associated equipment such as pumps, ducts and fans • Flue gas treatment reactors, baghouse filters, conveyors, silos • Steam turbines and condensers and cooling towers and associated equipment such as pipework, pumps and tanks • Demineralisation plants and effluent treatment plants and associated equipment such as pipework, pumps and tanks; (viii) Demolition of the EFW Facility (main building, admin building, tipping hall, boiler hall, turbine hall, flue gas treatment, stack, cooling towers, intermediate bulk ash building, in/up ramp, down/out ramp). The stack is required to be dismantled working in a systematic and controlled manner from the top down; (ix) Earthworks including bunker removal and infill of resultant voids; (x) Ground remediation; (xi) Demolition of the existing water pumping station on Ardra Road and connections between this and the EFW Facility; (xii) Demolition of existing associated/ancillary buildings, structures and plant such as clinical waste building, effluent treatment plant, weighbridges; (xiii) Site restoration works; and (xiv) Site completion and handback.
Timeline
- Completed: Pre-tender published4 August 2023Current notice
About the buyer
North London Waste Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 42320000 · Waste incinerators
- 45111100 · Demolition work
- 45111300 · Dismantling works
- 45112000 · Excavating and earthmoving work
- 45262660 · Asbestos-removal work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@north-london-waste-authority.gov |
36 similar open tenders
See more open tenders related to (Early Market Engagement) Decommission and Demolition of the Existing Energy from Waste (EfW) Facility on the Edmonton EcoPark.
- Open tender
Property Works
- Open tender
UK DTE Projects (various upcoming)
- Open tender
T1-5622-ISHA-DPS-Services
- Open tender
Asbestos Abatement
- Open tender
Dynamic Purchasing System for Plant Hire
Related topics
Topics related to (Early Market Engagement) Decommission and Demolition of the Existing Energy from Waste (EfW) Facility on the Edmonton EcoPark, ranked by notice volume.
- 8,426£973.7bn
Related buyers
Buyers similar to North London Waste Authority.
- 2,657£1.7bn
- 1,713£205.5bn
- 1,531£58.3bn
- 1,074£985.3m
- 949£2.3bn
- 900£690.3m
- 900£19.4bn
- 868£1.7bn
- 794£14.1bn
- 755£154.3m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.