Rockfall Protection System Installation
Details
- Buyer
- Dover Harbour Board
- Value
- GBP 5,000,000
- Topic
- Cliff-protection works
- Published
- 5 June 2023
- Submission
- 21 July 2023
- Source
- uk:contracts_finder
Tender description
The Contractor provides the management and implementation of the Rockfall Protection Systems 'Phase II - Phase V', summarised below: • Phase II (Envisaged Commencement within 2023) The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 223m (linear) of a 5m high (projection) GBE-500A rockfall barrier (and approximately 450m2 of a TECCO Stainless Steel (G65/3) slope stabilisation system) manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase III Envisaged Commencement within 2024) The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 191m (linear) of a 3m high (projection) GBE-500A rockfall barrier manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase IV Envisaged Commencement within 2025) The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation systems and the replacement installation of approximately 2750m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase V Envisaged Commencement within 2026) The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation system and the replacement installation of approximately 2400m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system (and approximately 12m2 of a SPIDER 'S3-130' rock protection system), manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
Timeline
- Completed: Tender published5 June 2023Current notice
- Completed: Submission date21 July 2023
About the buyer
Dover Harbour Board is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45243100 · Cliff-protection works
- 45243110 · Cliff-stabilisation works
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@dover-harbour-board.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@dover-harbour-board.gov |
Related buyers
Buyers similar to Dover Harbour Board.
- 2,606£1.6bn
- 1,690£204.6bn
- 1,511£58.1bn
- 1,037£972.0m
- 942£2.2bn
- 887£688.9m
- 885£19.4bn
- 842£1.7bn
- 768£14.1bn
- 739£1.3bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.