Awarded contract

Athlone Main Drainage Contract No. 2 – Networks Design and Build Contract

Details

Topic
Tanks
Published
8 January 2023
Source
eu:ted

Tender description

Irish Water plan to undertake the construction of a new sewerage collection network in Athlone including gravity sewers, 2 No. new pumping stations and 2 No. new storm tanks and rising main. The project will convey flows from Athlone to the Athlone WwTP. Lot 1: Irish Water is currently advancing the Athlone Main Drainage Contract No. 2 – Networks, comprising the construction of a new main lift pumping station, removal of storm overflows, new foul sewers, decommissioning of existing pumping stations and new large diameter trenchless pipeline (tunnel) sewers. The Contract has been procured under a Negotiated Procedure and the form of contract is Design-Build-Operate. The scope of the requirements to be provided as part of this project & contract include (but are not limited to) the design, construction, testing and commissioning of the following works at various sub-catchments:  Design and construction of a new foul and storm water pumping station, control building, 4,100m3 storm water storage and associated ancillaries at Golden Island Pumping Station;  Design and construction of a new foul and storm water pumping station, 110m3 storm water storage and associated ancillaries at Coosan West Pumping Station;  Design and installation of various gravity sewers and rising mains (c.3km), using open cut and trenchless technology methods, meeting the requirements of the Scope, through public roads, and public and private lands;  Design and installation of all required pipework and other ancillary works within the proposed Golden Island Pumping Station Site and proposed Coosan West Pumping Station Site;  Decommissioning of 6 No. SWOs and upgrade of 1 No. SWO meeting the requirements of the Scope.  Design and construction of a new overflow from Golden Island Pumping Station to the River Shannon;  Decommissioning of the existing pumping stations at West Bank and Coosan West (both sub and superstructures);  Demolition, decommissioning and disposal of the existing West Side and Abbey Road pumping stations (both sub and superstructures);  Decommissioning of the existing Golden Island pumping station substructure and conversion of ground floor into open-plan storage area;

Timeline

  1. Completed: Award published8 January 2023
    Current notice
  2. Completed: Award date8 January 2023

About the buyer

Irish Water is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 44611000 · Tanks
  • 45221230 · Shafts
  • 45221240 · Construction work for tunnels
  • 45221247 · Tunnelling works
  • 45232400 · Sewer construction work
  • 45232423 · Sewage pumping stations construction work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

2 similar open tenders

See more open tenders related to Athlone Main Drainage Contract No. 2 – Networks Design and Build Contract.

Explore all open tenders

Related buyers

Buyers similar to Irish Water.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.