Awarded contract

Undertake, Oversee and Deliver the overall Master Testing Plan

Details

Topic
Research and development consultancy services
Published
21 February 2022

Tender description

This contract relates to phase 2 of an ongoing project which is the next phase in assessing the suitability of the existing below 7bar gas distribution network to transport 100% hydrogen. Phase 2 is the 'Unoccupied Trial' and looks to take learning from previous phases in order to undertake field operations on a real life section of the NGN network. This will be the link between previous testing at Buxton / Spadeadam and any future fully occupied trial. Following the design and build of the H21 test facility in Middlesbrough by DNV GL under a fixed price contract, this contract will enable DNV GL to undertake, oversee and deliver the overall Master Testing Plan at the test facility over a 6 month period. The scope of scheduled tests and demonstrations currently being developed will be undertaken on the mains supply within the site to confirm their suitability, and the suitability of existing industry procedures when used in conjunction with other assets containing 100% hydrogen. The tests will address all elements of local LP distribution maintenance and include; commissioning, decommissioning, repairs, new connections, pressure reduction, flow analysis, flow stop operations and new innovation methods. As this is NGN's first project of this nature in a public space the need was recognised to utilise an organisation with history and experience in this field to oversee the design, build and subsequent operation of this facility for the duration of the trial whilst also developing the required safe operating procedures. As project partners and having been appointed to design and build this facility DNVGL were the only realistic solution for this contract Lot 1: This contract relates to phase 2 of an ongoing project which is the next phase in assessing the suitability of the existing below 7bar gas distribution network to transport 100% hydrogen. Phase 2 is the 'Unoccupied Trial' and looks to take learning from previous phases in order to undertake field operations on a real life section of the NGN network. This will be the link between previous testing at Buxton / Spadeadam and any future fully occupied trial. Following the design and build of the H21 test facility in Middlesbrough by DNV GL under a fixed price contract, this contract will enable DNV GL to undertake, oversee and deliver the overall Master Testing Plan at the test facility over a 6 month period. The scope of scheduled tests and demonstrations currently being developed will be undertaken on the mains supply within the site to confirm their suitability, and the suitability of existing industry procedures when used in conjunction with other assets containing 100% hydrogen. The tests will address all elements of local LP distribution maintenance and include; commissioning, decommissioning, repairs, new connections, pressure reduction, flow analysis, flow stop operations and new innovation methods. As this is NGN's first project of this nature in a public space the need was recognised to utilise an organisation with history and experience in this field to oversee the design, build and subsequent operation of this facility for the duration of the trial whilst also developing the required safe operating procedures. As project partners and having been appointed to design and build this facility DNVGL were the only realistic solution for this contract

Timeline

  1. Completed: Award published21 February 2022
    Current notice
  2. Completed: Award date8 March 2022

About the buyer

Northern Gas Networks is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 73200000 · Research and development consultancy services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

11 similar open tenders

See more open tenders related to Undertake, Oversee and Deliver the overall Master Testing Plan.

Explore all open tenders

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.