Tracking progress in non-residential buildings decarbonisation
Details
- Value
- GBP 25,000
- Topic
- Research and development services and related consultancy services
- Published
- 15 February 2022
- Submission
- 28 February 2022
- Source
- uk:contracts_finder
Tender description
Every summer, the CCC publishes the UK Progress Report, assessing UK progress towards Net Zero. For each key sector, we publish a set of indicators to monitor progress. We are currently refreshing our progress monitoring framework, including our indicators for buildings. In recent years, CCC's indicators for buildings have focussed on residential buildings. Residential buildings comprise a more significant component of buildings emissions, and data is more readily available to track progress. Given the heterogeneous stock of non-residential buildings, indicators counting roll-out of low carbon heating technologies or insulation measures are less robust than for residential buildings. Despite these challenges, the CCC plans to develop indicator(s) on non-residential building decarbonisation for the 2022 Progress Report. CCC typically divides non-residential buildings into public and commercial buildings, mirroring classifications in datasets such as DUKES. The main areas of progress we would like to track are: • Energy demand reduction due to energy efficiency and behaviour change measures • Shifts towards a reliance on low-carbon heating for space and water heating in non-domestic buildings Given the heterogeneous nature of non-residential buildings, in particular their varying size, we have assessed that tracking energy intensity (kWh/m2) would be a useful indicator of progress in energy efficiency measures in non-residential buildings. Our internal scoping has identified the ND-NEED dataset as a potential new source of data for an energy intensity indicator. The ND-NEED dataset will be published annually and includes the gas and electricity energy intensity (kWh/m2/year) of non-domestic buildings, broken down into building types (education, health etc). Gas energy intensity is a promising metric for tracking the impact of energy efficiency measures as it addresses the different sizes of non-domestic buildings by taking into account floorspace. However, the total gas consumption recorded in ND-NEED differs significantly from the total gas consumption in CCC Sixth Carbon Budget (6CB) modelling, even when factories (which aren't considered within buildings in the 6CB modelling) are removed. This makes it challenging to develop milestones for energy intensity based on ND-NEED data. Unless this difference can be addressed, we will need to identify a different indicator source, or take an alternative approach to setting annual milestones for energy intensity (e.g. - have milestones tracking the % change in energy intensity, or only track certain building types which match up with CCC modelling). *** See Specification for more detail ***
Timeline
- Completed: Tender published15 February 2022Current notice
- Completed: Submission date28 February 2022
About the buyer
The Committee On Climate Change is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 73000000 · Research and development services and related consultancy services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@the-committee-on-climate-change.gov |
32 similar open tenders
See more open tenders related to Tracking progress in non-residential buildings decarbonisation.
- Open tender
Expert Partner Panel Procurement 2026
- Open tender
Management Consultancy Dynamic Market
- Open tender
Space Technology Solutions
Related topics
Topics related to Tracking progress in non-residential buildings decarbonisation, ranked by notice volume.
- 1,250£90.8bn
Related buyers
Buyers similar to The Committee On Climate Change.
- 2,599£1.6bn
- 882£19.4bn
- 678£8.8bn
- 463£15.4bn
- 426£3.8bn
- 341£20.3m
- 294£367.0m
- 257£233.4m
- 247£577.4m
- 232£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
