Property Flood Resilience Framework
Details
- Value
- GBP 50,000,000
- Topic
- Flood-prevention works
- Published
- 30 November 2022
- Source
- uk:find_a_tender
Tender description
As per the Property Flood Resilience (PFR) Framework PIN released on the 26 March 2021 and the Asset Delivery Frameworks PIN released on the 29 July 2022, the Environment Agency (EA) requires a route to market to enable PFR schemes to be delivered successfully. It will help ensure that residential and commercial properties are better protected from the threat of flooding.<br/><br/>This PIN details the information and relevant documentation relating to the procurement and commercial models proposed for the forthcoming procurement exercise which have been developed considering previous stages of market engagement. Lot 2b: Lot 2: North-West Lot 2: Detailed Design and Construction<br/><br/>Provide access to competent installers to:<br/>• undertake property inspection to inform detailed design process<br/>• carry out detailed design of preferred resistance measures (PFR standard 3)<br/>• provide contract scope, written summary and programme to the client and property owner (PFR standard 4)<br/>• install preferred resistance measure solution (PFR standard 4)<br/>• attend Audit with Lot 1 surveyor and carry out any actions required (PFR standard 5)<br/>• develop and distribute End-user Handover Pack and deliver training (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 1c: Lot 1: Central Lot 1: Survey, Options & Quality Assurance<br/><br/>Provide access to competent, independent surveyors to:<br/>• confirm eligibility and suitability of PFR as a solution (PFR standard 1 and 2)<br/>• identify options for resistance measures (PFR standard 3)<br/>• provide recoverability and preparedness recommendations (PFR standard 3)<br/>• carry out an Audit of Installation (PFR standard 5)<br/>• complete a Post Installation Flood Risk Report (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 2c: Lot 2: Central Lot 2: Detailed Design and Construction<br/><br/>Provide access to competent installers to:<br/>• undertake property inspection to inform detailed design process<br/>• carry out detailed design of preferred resistance measures (PFR standard 3)<br/>• provide contract scope, written summary and programme to the client and property owner (PFR standard 4)<br/>• install preferred resistance measure solution (PFR standard 4)<br/>• attend Audit with Lot 1 surveyor and carry out any actions required (PFR standard 5)<br/>• develop and distribute End-user Handover Pack and deliver training (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 2d: Lot 2: South-West Lot 2: Detailed Design and Construction<br/><br/>Provide access to competent installers to:<br/>• undertake property inspection to inform detailed design process<br/>• carry out detailed design of preferred resistance measures (PFR standard 3)<br/>• provide contract scope, written summary and programme to the client and property owner (PFR standard 4)<br/>• install preferred resistance measure solution (PFR standard 4)<br/>• attend Audit with Lot 1 surveyor and carry out any actions required (PFR standard 5)<br/>• develop and distribute End-user Handover Pack and deliver training (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 1f: Lot 1: East Lot 1: Survey, Options & Quality Assurance<br/><br/>Provide access to competent, independent surveyors to:<br/>• confirm eligibility and suitability of PFR as a solution (PFR standard 1 and 2)<br/>• identify options for resistance measures (PFR standard 3)<br/>• provide recoverability and preparedness recommendations (PFR standard 3)<br/>• carry out an Audit of Installation (PFR standard 5)<br/>• complete a Post Installation Flood Risk Report (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 2f: Lot 2: East Lot 2: Detailed Design and Construction<br/><br/>Provide access to competent installers to:<br/>• undertake property inspection to inform detailed design process<br/>• carry out detailed design of preferred resistance measures (PFR standard 3)<br/>• provide contract scope, written summary and programme to the client and property owner (PFR standard 4)<br/>• install preferred resistance measure solution (PFR standard 4)<br/>• attend Audit with Lot 1 surveyor and carry out any actions required (PFR standard 5)<br/>• develop and distribute End-user Handover Pack and deliver training (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 1b: Lot 1: North-West Lot 1: Survey, Options & Quality Assurance<br/><br/>Provide access to competent, independent surveyors to:<br/>• confirm eligibility and suitability of PFR as a solution (PFR standard 1 and 2)<br/>• identify options for resistance measures (PFR standard 3)<br/>• provide recoverability and preparedness recommendations (PFR standard 3)<br/>• carry out an Audit of Installation (PFR standard 5)<br/>• complete a Post Installation Flood Risk Report (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 1a: Lot 1: North-East Lot 1: Survey, Options & Quality Assurance<br/><br/>Provide access to competent, independent surveyors to:<br/>• confirm eligibility and suitability of PFR as a solution (PFR standard 1 and 2)<br/>• identify options for resistance measures (PFR standard 3)<br/>• provide recoverability and preparedness recommendations (PFR standard 3)<br/>• carry out an Audit of Installation (PFR standard 5)<br/>• complete a Post Installation Flood Risk Report (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 2a: Lot 2: North-East Lot 2: Detailed Design and Construction<br/><br/>Provide access to competent installers to:<br/>• undertake property inspection to inform detailed design process<br/>• carry out detailed design of preferred resistance measures (PFR standard 3)<br/>• provide contract scope, written summary and programme to the client and property owner (PFR standard 4)<br/>• install preferred resistance measure solution (PFR standard 4)<br/>• attend Audit with Lot 1 surveyor and carry out any actions required (PFR standard 5)<br/>• develop and distribute End-user Handover Pack and deliver training (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 2e: Lot 2: South-East Lot 2: Detailed Design and Construction<br/><br/>Provide access to competent installers to:<br/>• undertake property inspection to inform detailed design process<br/>• carry out detailed design of preferred resistance measures (PFR standard 3)<br/>• provide contract scope, written summary and programme to the client and property owner (PFR standard 4)<br/>• install preferred resistance measure solution (PFR standard 4)<br/>• attend Audit with Lot 1 surveyor and carry out any actions required (PFR standard 5)<br/>• develop and distribute End-user Handover Pack and deliver training (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 1d: Lot 1: South-West Lot 1: Survey, Options & Quality Assurance<br/><br/>Provide access to competent, independent surveyors to:<br/>• confirm eligibility and suitability of PFR as a solution (PFR standard 1 and 2)<br/>• identify options for resistance measures (PFR standard 3)<br/>• provide recoverability and preparedness recommendations (PFR standard 3)<br/>• carry out an Audit of Installation (PFR standard 5)<br/>• complete a Post Installation Flood Risk Report (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5) Lot 1e: Lot 1: South-East Lot 1: Survey, Options & Quality Assurance<br/><br/>Provide access to competent, independent surveyors to:<br/>• confirm eligibility and suitability of PFR as a solution (PFR standard 1 and 2)<br/>• identify options for resistance measures (PFR standard 3)<br/>• provide recoverability and preparedness recommendations (PFR standard 3)<br/>• carry out an Audit of Installation (PFR standard 5)<br/>• complete a Post Installation Flood Risk Report (PFR standard 5)<br/>• support development and delivery of end user/community exercise (PFR standard 5)
Timeline
- Completed: Pre-tender published30 November 2022Current notice
About the buyer
Department for Environment, Food & Rural Affairs (DEFRA) is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45246400 · Flood-prevention works
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@department-for-environment-food-rural-affairs-defra.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@department-for-environment-food-rural-affairs-defra.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@department-for-environment-food-rural-affairs-defra.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@department-for-environment-food-rural-affairs-defra.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@department-for-environment-food-rural-affairs-defra.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@department-for-environment-food-rural-affairs-defra.gov |
3 similar open tenders
See more open tenders related to Property Flood Resilience Framework.
Related topics
Topics related to Property Flood Resilience Framework, ranked by notice volume.
- 173,470£11.6tn
Related buyers
Buyers similar to Department for Environment, Food & Rural Affairs (DEFRA).
- 1,557£58.9bn
- 695£133.3bn
- 646£160.0bn
- 467£8.6bn
- 340£7.4bn
- 330£1.3bn
- 285£1.1bn
- 271£904.1m
- 229£550.1m
- 187£223.3bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
