Internal Work Management System (WMS)
Details
- Supplier(s)
- Jones Lang LaSalle
- Value
- 3,000,000
- Topic
- Software package and information systems
- Published
- 2 December 2022
- Source
- uk:find_a_tender
Tender description
NGED has procured a WMS for use across their East Midlands, West Midlands, South West and South Wales licence areas. The WMS shall improve the coordination and management of NGED's workforce. NGED is undergoing significant change as it prepares to become a key facilitator in the net zero transition. The electricity network will see an acceleration in the uptake of Low Carbon Technologies (LCTs) as transport and heating decarbonises. In addition, there is also a requirement to efficiently manage an ageing asset base. In both cases, there is a need for NGED to drive operational changes to maintain and improve the high level of network reliability and cost-effectiveness for their customers. NGED's Enterprise Asset Management (EAM) system, CROWN, is used to manage all asset related activities. CROWN is therefore the primary tool for managing volumes of maintenance and new connection related work. NGED currently use an in-house developed software system called STARS to schedule resources for field-based jobs and tasks. These jobs and tasks include inspections, maintenance of plant and equipment, responding to faults and providing new electricity connections from low voltage up to 132,000 V. Presently, scheduling and allocating resources to carry out the work is predominantly manually driven at a local level with limited visibility to understand detailed costs and timescales for each relevant activity across the business. This approach is already beginning to be difficult to manage under both the volume of new connections and the scale of maintenance required across the entire network. In addition, the current system does not provide senior managers with easy access to understand underlying costs and timescale variations. The new WMS is intended to replace STARS and provide the intelligence, user-experience and functionality required by NGED to efficiently manage its network and workforce. Lot 1: NGED has procured a WMS for use across their East Midlands, West Midlands, South West and South Wales licence areas. The WMS shall improve the coordination and management of NGED's workforce. NGED is undergoing significant change as it prepares to become a key facilitator in the net zero transition. The electricity network will see an acceleration in the uptake of Low Carbon Technologies (LCTs) as transport and heating decarbonises. In addition, there is also a requirement to efficiently manage an ageing asset base. In both cases, there is a need for NGED to drive operational changes to maintain and improve the high level of network reliability and cost-effectiveness for their customers. NGED's Enterprise Asset Management (EAM) system, CROWN, is used to manage all asset related activities. CROWN is therefore the primary tool for managing volumes of maintenance and new connection related work. NGED currently use an in-house developed software system called STARS to schedule resources for field-based jobs and tasks. These jobs and tasks include inspections, maintenance of plant and equipment, responding to faults and providing new electricity connections from low voltage up to 132,000 V. Presently, scheduling and allocating resources to carry out the work is predominantly manually driven at a local level with limited visibility to understand detailed costs and timescales for each relevant activity across the business. This approach is already beginning to be difficult to manage under both the volume of new connections and the scale of maintenance required across the entire network. In addition, the current system does not provide senior managers with easy access to understand underlying costs and timescale variations. The new WMS is intended to replace STARS and provide the intelligence, user-experience and functionality required by NGED to efficiently manage its network and workforce.
Timeline
- Completed: Award date25 October 2022
- Completed: Award published2 December 2022Current notice
About the buyer
Western Power Distribution is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 48000000 · Software package and information systems
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@western-power-distribution.gov |
32 similar open tenders
See more open tenders related to Internal Work Management System (WMS).
- Open tender
Internet of Things
- Open tender
Space Technology Solutions
- Open tender
ICT Hardware and Software
Related buyers
Buyers similar to Western Power Distribution.
- 130£849.0m
- 81£104.7m
- 74£3.3bn
- 70£2.5bn
- 64£3.4bn
- 43£11.2bn
- 42£31.2m
- 35£137.6m
- 33£4.1bn
- 28£1.4bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
