Closed tender

ORE/22/093 - Floating Offshore Wind - Cost, Risk and Failure of Different Mooring Spreads and Number of Mooring Lines

Details

Topic
Analysis services
Published
6 September 2022
Submission
4 October 2022

Tender description

<p>The consequences and associated costs of mooring line failure on a floating offshore wind turbine (FOWT) is an area of great debate within the mooring and anchoring space. These consequences will not only have operational implications (such as lost energy production, mooring line replacement, export cable maintenance, anchor re-positioning etc.) but the knowledge of these consequences and costs will also have an effect on the mooring and anchoring methodology applied to a FOWT. Previous studies on the subject matter have largely concentrated on the likelihood of different failure modes, whereas this study will concentrate on the consequences of such failures. Assuming different mooring line failure modes, the study shall consider: • What corrective actions are needed? • What risk is there to other systems / assets? • What systems are in place to prevent further damage? • How much in total is a failure going to cost?</p> Keywords: Consultancy

Timeline

  1. Completed: Tender published6 September 2022
    Current notice
  2. Completed: Submission date4 October 2022

About the buyer

Offshore Renewable Energy Catapult is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 71620000 · Analysis services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to ORE/22/093 - Floating Offshore Wind - Cost, Risk and Failure of Different Mooring Spreads and Number of Mooring Lines, ranked by notice volume.

View all topics
TopicCountValue
  1. 3,593
    £717.5bn
  2. 808
    £44.3bn

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.