Stale Pre-tender

Pumped Storage Hydro Project in Scotland, UK.

Details

Topic
Engineering works and construction works
Published
28 July 2022

Tender description

Expressions of interest are sought from globally experienced pump storage power station designers and construction execution companies & consortia who have proven capabilities to deliver a new build 600MW Pumped Storage Hydro Project in Scotland, UK. Geotechnical investigations commence from Q4 2022 in support of a FEED study and eventual detailed design works. The construction phase starts in Q4 2025. Project Description; The physical construction works include the construction of a new intake structure within an operational upper reservoir connected via new hydraulic tunnel systems to the powerhouse complex excavated in quartz dolorite rock 400m below ground level. The powerhouse will be a series of underground caverns containing reversible pump-turbines, motor-generators and associated equipment including transformers and switchgear. A new tailrace tunnel will be constructed from the powerhouse to a new outfall structure in an existing lower reservoir. A vertical ventilation shaft from the powerhouse will connect through to an expanded existing above ground sub-station complex. A new 1.45km main access tunnel will link the powerhouse to a new jetty constructed along the lower reservoir. Forming the main access tunnel portal will require the diversion of a trunk road. The construction spoil is planned to be taken out through the mountain to the jetty and stored prior to off-site removal. New administration and workshop buildings will be built on the jetty. Existing access roads will be upgraded together with the construction of new roads as required. Lot 1: Expressions of interest are sought from globally experienced pump storage power station designers and construction execution companies & consortia who have proven capabilities to deliver a new build 600MW Pumped Storage Hydro Project in Scotland, UK. Geotechnical investigations commence from Q4 2022 in support of a FEED study and eventual detailed design works. The construction phase starts in Q4 2025. Project Description; The physical construction works include the construction of a new intake structure within an operational upper reservoir connected via new hydraulic tunnel systems to the powerhouse complex excavated in quartz dolorite rock 400m below ground level. The powerhouse will be a series of underground caverns containing reversible pump-turbines, motor-generators and associated equipment including transformers and switchgear. A new tailrace tunnel will be constructed from the powerhouse to a new outfall structure in an existing lower reservoir. A vertical ventilation shaft from the powerhouse will connect through to an expanded existing above ground sub-station complex. A new 1.45km main access tunnel will link the powerhouse to a new jetty constructed along the lower reservoir. Forming the main access tunnel portal will require the diversion of a trunk road. The construction spoil is planned to be taken out through the mountain to the jetty and stored prior to off-site removal. New administration and workshop buildings will be built on the jetty. Existing access roads will be upgraded together with the construction of new roads as required.

Timeline

  1. Completed: Pre-tender published28 July 2022
    Current notice

About the buyer

Drax Power Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45220000 · Engineering works and construction works

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

14 similar open tenders

See more open tenders related to Pumped Storage Hydro Project in Scotland, UK..

Explore all open tenders

Related topics

Topics related to Pumped Storage Hydro Project in Scotland, UK., ranked by notice volume.

View all topics
TopicCountValue
  1. 4,088
    £269.5bn

Related buyers

Buyers similar to Drax Power Ltd.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.