HyNet North West Hydrogen Pipeline Engineering, Procurement, Construction & Commissioning (EPCC) Contract
Details
- Buyer
- Cadent Gas Limited
- Topic
- Hydrogen
- Published
- 28 July 2022
- Source
- uk:find_a_tender
Tender description
The HyNet North West Hydrogen Pipeline will be Cadent's first 100 per cent hydrogen pipeline. The pipeline forms part of the wider HyNet scheme, whose primary objective is to reduce the regional CO2 omissions. The pipeline will provide a hydrogen transportation network required to enable the UK's first fully integrated hydrogen supply system It is anticipated that there will be approximately 125km of underground HP steel pipeline and associated lower pressure spurs and Hydrogen Above Ground Installations (HAGI's). The pipeline is considered a National Significant Infrastructure Project (NSIP) and shall be delivered in line with the, to be submitted (by others), Development Consent Order (DCO). The project will deliver Phase 2 of the hydrogen network and is designed to enable early adopters to receive hydrogen and interlinks with hydrogen production and storage facilities. Cadent is looking to identify a single entity (JV / Consortium) to deliver the full EPCC scope Further information on the project and the interactive route corridor map can be found at: https://www.hynethydrogenpipeline.co.uk/ Lot 1: Secure a contractor entity who has the capability and ownership to undertake the detailed design engineering, procurement, construction and commissioning of the HyNet Phase 2 Project, including delivery in line with the DCO submission. Additional information: Further information on the project and the interactive route corridor map can be found at: https://www.hynethydrogenpipeline.co.uk/
Timeline
- Completed: Pre-tender published28 July 2022Current notice
About the buyer
Cadent Gas Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 24111600 · Hydrogen
- 44161100 · Gas pipelines
- 44161110 · Gas-distribution network
- 44161500 · High-pressure pipeline
- 44161600 · Low-pressure pipeline
- 45210000 · Building construction work
- 45220000 · Engineering works and construction works
- 45255000 · Construction work for the oil and gas industry
- 71322200 · Pipeline-design services
- 71340000 · Integrated engineering services
- 71510000 · Site-investigation services
- 71520000 · Construction supervision services
- 71540000 · Construction management services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@cadent-gas-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@cadent-gas-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@cadent-gas-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@cadent-gas-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@cadent-gas-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@cadent-gas-limited.gov |
78 similar open tenders
See more open tenders related to HyNet North West Hydrogen Pipeline Engineering, Procurement, Construction & Commissioning (EPCC) Contract.
- Open tender
Southern Construction Framework (SCF-6)
- Open tender
Provision of Contractor Services
- Open tender
DPS 2025 - Integrated Design Team
Related topics
Topics related to HyNet North West Hydrogen Pipeline Engineering, Procurement, Construction & Commissioning (EPCC) Contract, ranked by notice volume.
- 173,470£11.6tn
Related buyers
Buyers similar to Cadent Gas Limited.
- 131£850.3m
- 81£104.7m
- 74£3.3bn
- 70£2.5bn
- 65£3.4bn
- 43£11.2bn
- 42£31.2m
- 36£141.7m
- 33£4.1bn
- 28£1.4bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.