LV Voltage Control devices: Request for Information (Project SILVERSMITH)
Details
- Value
- GBP 0.01
- Topic
- Electrical machinery, apparatus, equipment and consumables; lighting
- Published
- 14 July 2022
- Source
- uk:find_a_tender
Tender description
SILVERSMITH (Solving Intelligent LV - Evaluating Responsive Smart Management to Increase Total Headroom) is a 10 month NIA project investigating the future challenges and opportunities for our LV network. It aims to identify the scale and demographic of thermal, voltage, and power quality based compliance issues due to the proliferation of Low Carbon Technologies (LCTs), and Distributed Generation (DG) being connected to our Low Voltage (LV) network. We will explore new and upcoming devices and strategies to address these issues. In partnership with EA Technology Ltd, we are conducting a network evaluation study to model our LV network considering the projected uptake of new LCTs and DG. This will provide us with insights into the types of issues we are most likely to experience in the future, and enable us to work closely with suppliers to ensure the future reinforcement or upgrade requirements can be achieved at the lowest cost at this pre-adoption stage. What are we hoping to achieve? Whilst we already have several tried and tested means to address compliance issues, engagement with suppliers such as yourself has suggested that we should be considering all approaches going forwards. Through a literature review of past innovation projects and peer-reviewed academia, along with this Request for Information (RfI), we want to capture the state-of-the-art LV Voltage Control devices. Pairing this with our network study and an understanding of the functional requirements we will need, SILVERSMITH will create a methodology for us and other DNOs to follow when making procurement and investment decisions on their LV networks. Lot 1: SILVERSMITH (Solving Intelligent LV - Evaluating Responsive Smart Management to Increase Total Headroom) is a 10 month NIA project investigating the future challenges and opportunities for our LV network. It aims to identify the scale and demographic of thermal, voltage, and power quality based compliance issues due to the proliferation of Low Carbon Technologies (LCTs), and Distributed Generation (DG) being connected to our Low Voltage (LV) network. We will explore new and upcoming devices and strategies to address these issues. In partnership with EA Technology Ltd, we are conducting a network evaluation study to model our LV network considering the projected uptake of new LCTs and DG. This will provide us with insights into the types of issues we are most likely to experience in the future, and enable us to work closely with suppliers to ensure the future reinforcement or upgrade requirements can be achieved at the lowest cost at this pre-adoption stage. What are we hoping to achieve? Whilst we already have several tried and tested means to address compliance issues, engagement with suppliers such as yourself has suggested that we should be considering all approaches going forwards. Through a literature review of past innovation projects and peer-reviewed academia, along with this Request for Information (RfI), we want to capture the state-of-the-art LV Voltage Control devices. Pairing this with our network study and an understanding of the functional requirements we will need, SILVERSMITH will create a methodology for us and other DNOs to follow when making procurement and investment decisions on their LV networks.
Timeline
- Completed: Pre-tender published14 July 2022Current notice
About the buyer
Western Power Distribution is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 31000000 · Electrical machinery, apparatus, equipment and consumables; lighting
- 65300000 · Electricity distribution and related services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@western-power-distribution.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@western-power-distribution.gov |
29 similar open tenders
See more open tenders related to LV Voltage Control devices: Request for Information (Project SILVERSMITH).
- Open tender
Space Technology Solutions
- Open tender
Flexibility Services
Related buyers
Buyers similar to Western Power Distribution.
- 131£850.3m
- 81£104.7m
- 74£3.3bn
- 70£2.5bn
- 65£3.4bn
- 43£11.2bn
- 42£31.2m
- 36£141.7m
- 33£4.1bn
- 28£1.4bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
