Supply and Installation of Plant and Equipment at a Proposed Regional Wood Reprocessing Facility at Silent Valley, Blaenau Gwent.
Details
- Value
- GBP 2,000,000
- Topic
- Recycling equipment
- Published
- 23 March 2022
- Source
- uk:sell2wales
Tender description
1. The purpose of this Prior Information Notice (PIN) is to alert potential suppliers to an opportunity in relation to the Local Authorities’ requirements for the turnkey supply and install of the plant and equipment required for the regional wood reprocessing facility at the Silent Valley waste management site near Ebbw Vale in Blaenau Gwent. 2. The wider site is currently used for waste treatment and recycling activities, and has a weighbridge, excellent transport and drainage infrastructure and is already in possession of various waste management consents, which will assist the development and delivery of the planned c.30,000 tpa wood reprocessing facility. 3. The plant and equipment (powered by electricity where possible, to reduce CO2 emissions) will be procured under a turnkey solution and will be installed following completion of the construction works. The estimated value is estimated at c.2m GBP. 4.The overall objectives of the project are to create a modern and sustainable wood reprocessing facility at the designated waste site at Silent Valley. The facility will be equipped with specialist (electric) plant and machinery, designed to produce specification woodchip products primarily targeting the panel board sector. 5. The lead Authority wishes to engage with the supply chain as early as possible and will consult with the market prior to commencement of the procurement. Lot 1: 1. The purpose of this Prior Information Notice (PIN) is to alert potential suppliers to an opportunity in relation to the Local Authorities’ requirements for the turnkey supply and install of the plant and equipment required for the regional wood reprocessing facility at the Silent Valley waste management site near Ebbw Vale in Blaenau Gwent. 2. The wider site is currently used for waste treatment and recycling activities, and has a weighbridge, excellent transport and drainage infrastructure and is already in possession of various waste management consents, which will assist the development and delivery of the planned c.30,000 tpa wood reprocessing facility. 3. A partnership has been proposed that will comprise a group of local authorities in Wales who will provide waste wood “feedstock” to the facility from their respective civic amenity sites. The host Authority Blaenau Gwent County Borough Council have developed the concept design for the facility and will now procure and obtain the necessary planning and environmental permits. 4. In parallel, the partnership and its advisors plan to procure an 80m x 20m steel-framed processing hall, which is intended to house the array of process plant designed to process ad-hoc wood waste into a specification woodchip suitable for panel-board manufacturing. To produce the woodchip, the scope of this opportunity may typically include a pre-crusher, shredder, picking station, screens, magnets, mobile telehandler, wheeled loader etc. 5. The plant and equipment (powered by electricity where possible, to reduce CO2 emissions) will be procured under a turnkey solution and will be installed following completion of the construction works. The estimated value is estimated at c.2m GBP. 6. A concept design for the facility has been produced by the lead Authority’s engineering team, which will inform the construction works and provide an “envelope” template for the process plant. 7. The overall objectives of the project are to create a modern and sustainable wood reprocessing facility at the designated waste site at Silent Valley. The facility will be equipped with specialist (electric) plant and machinery, designed to produce specification woodchip products primarily targeting the panel board sector. 8. The lead Authority wishes to engage with the supply chain as early as possible and will consult with the market prior to commencement of the procurement.
Timeline
- Completed: Pre-tender published23 March 2022Current notice
About the buyer
Blaenau Gwent County Borough Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 42914000 · Recycling equipment
- 90514000 · Refuse recycling services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@blaenau-gwent-county-borough-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@blaenau-gwent-county-borough-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@blaenau-gwent-county-borough-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@blaenau-gwent-county-borough-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@blaenau-gwent-county-borough-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@blaenau-gwent-county-borough-council.gov |
10 similar open tenders
See more open tenders related to Supply and Installation of Plant and Equipment at a Proposed Regional Wood Reprocessing Facility at Silent Valley, Blaenau Gwent..
- Open tender
DPS
- Open tender
Waste Management Dynamic Purchasing System
Related topics
Topics related to Supply and Installation of Plant and Equipment at a Proposed Regional Wood Reprocessing Facility at Silent Valley, Blaenau Gwent., ranked by notice volume.
- 4,088£269.5bn
Related buyers
Buyers similar to Blaenau Gwent County Borough Council.
- 254£399.2m
- 164£806.5m
- 145£123.9m
- 126£142.0m
- 114£370.5m
- 103£389.4m
- 97£638.1m
- 93£873.8m
- 91£2.9bn
- 87£24.8m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.