Stale Pre-tender

Detritiation Furnace Concept Design

Details

Topic
Industrial or laboratory furnaces, incinerators and ovens
Published
7 March 2022

Tender description

The UKAEA is currently exploring the possibility of constructing a new thermal detritiation facility based upon existing technology used in the Materials Detritiation Facility (MDF) at the Culham Science Center. These investigations are sought to identify opportunities to reduce the amount of Intermediate Level Waste (ILW) which is sent for long term storage in a Geological Disposal Facility (GDF). The new thermal detritiation facility would be capable of accepting larger items for detritiation, be designed for a higher throughput, be loaded and operated remotely and have more flexible operating limits (including temperature and air flow) to cope with expected future demands. Ideally, the furnace at the heart of the thermal detritiation facility will be Commercial Off The Shelf (COTS) equipment, or COTS with minor modification. Lot 1: The UKAEA is currently exploring the possibility of constructing a new thermal detritiation facility based upon existing technology used in the Materials Detritiation Facility (MDF) at the Culham Science Center. These investigations are sought to identify opportunities to reduce the amount of Intermediate Level Waste (ILW) which is sent for long term storage in a Geological Disposal Facility (GDF). The new thermal detritiation facility would be capable of accepting larger items for detritiation, be designed for a higher throughput, be loaded and operated remotely and have more flexible operating limits (including temperature and air flow) to cope with expected future demands. Ideally, the furnace at the heart of the thermal detritiation facility will be Commercial Off The Shelf (COTS) equipment, or COTS with minor modification. The desired outcome of this Prior Information Notice is for the UKAEA to understand the limits and opportunities available with COTS furnaces across the supply chain. This is intended to ensure that the thermal detritiation facility concept design is both achievable and affordable.

Timeline

  1. Completed: Pre-tender published7 March 2022
    Current notice

About the buyer

UK Atomic Energy Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 42300000 · Industrial or laboratory furnaces, incinerators and ovens
  • 42940000 · Machinery for the heat treatment of materials
  • 42942000 · Ovens and accessories

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.